Files
stack/docs/scratchpads/mvp-20260312.md
2026-03-13 13:56:50 +00:00

9.7 KiB
Raw Blame History

Mission Scratchpad — MVP

Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.

Original Mission Prompt

Active mission detected: MVP. Read the mission state files and report status.
User confirmed: start the planning gate.

Planning Decisions

2026-03-13 — Milestone and task breakdown

  • PRD defines 8 phases (Phase 07), mapped 1:1 to Gitea milestones
  • 59 issues created on git.mosaicstack.dev/mosaic/mosaic-stack (#1#59)
  • Each phase has a verification task as the final issue
  • Task IDs use P{phase}-{seq} format (P0-001 through P7-008)
  • Repo created as mosaic/mosaic-stack (private) on Gitea
  • Milestones: ms-157 (Phase 0) through ms-164 (Phase 7)
  • Total: 59 tasks across 8 milestones

Phase structure

Phase Version Tasks Focus
0 v0.0.1 9 Foundation — monorepo, types, db, auth, OTEL, Docker, CI
1 v0.0.2 9 Core API — gateway, brain, queue, routes, WebSocket
2 v0.0.3 7 Agent Layer — Pi SDK, multi-provider, routing, coord
3 v0.0.4 8 Web Dashboard — Next.js, chat, tasks, projects, admin
4 v0.0.5 7 Memory & Intelligence — memory, log, summarization, skills
5 v0.0.6 5 Remote Control — Discord, Telegram, SSO
6 v0.0.7 6 CLI & Tools — CLI, prdy, quality-rails, installer, TUI
7 v0.1.0 8 Polish & Beta — MCP, providers, E2E, docs, release

Session Log

Session Date Milestone Tasks Done Outcome
1 2026-03-13 Planning Planning gate Milestones created, 59 issues created, TASKS.md populated, manifest updated
2 2026-03-13 Vertical slice P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 Communication spine built and merged (PR #61). Gateway + TUI + Discord. 3-agent gatekeeper review, 10/16 issues remediated, 4 deferred.
3 2026-03-13 Foundation P0-002, P0-005, P0-006 Foundation layer merged (PR #65). Docker Compose (PG+pgvector, Valkey, OTEL Collector, Jaeger), OTEL auto-instrumentation in gateway, @mosaic/types with DTOs + Socket.IO typed event maps.

Session 4 — Docker Compose fix

Session Date Milestone Tasks Done Outcome
4 2026-03-12 Foundation (fix) Fixed Jaeger tag (2→2.6.0), remapped PG/Valkey ports (5433/6380) to avoid host conflicts. PR #66 merged to main.

Verification evidence:

  • All 4 containers healthy (PG, Valkey, OTEL Collector, Jaeger)
  • OTEL pipeline proven: mosaic-gateway service visible in Jaeger UI
  • Gateway traces flow through Collector → Jaeger

Session 5 — Phase 0-1 completion

Session Date Milestone Tasks Done Outcome
5 2026-03-12 Phase 0, Phase 1 P0-003, P0-004, P0-007, P0-008, P0-009, P1-002P1-006, P1-009 Foundation + Core API complete. DB, auth, CI, brain, queue, CRUD routes all merged and green.

Session 6 — Phase 2 agent layer

Session Date Milestone Tasks Done Outcome
6 2026-03-12 Phase 2 P2-002, P2-003, P2-004, P2-005, P2-006, FIX-01 Multi-provider routing, tool registration, coord migration, session management, dispose() fix. PRs #74#78.

Session 7-8 — Phase 2 verification + completion

Session Date Milestone Tasks Done Outcome
7-8 2026-03-12 Phase 2 P2-007 19 unit tests (routing + coord). PR #79 merged, issue #25 closed. Phase 2 complete.

Open Questions

(none at this time)

Corrections

2026-03-13 — Vertical slice reorder (Jason directed)

Original plan: Linear Phase 0 → 1 → 2 → ... execution.

Correction: Vertical slice first. Scaffold monorepo, then build the Pi TUI → Gateway → Discord communication spine end-to-end before backfilling auth, brain, memory, CRUD, etc.

Why: Validate the architecture's core message flow before investing in horizontal layers. If the communication channels don't work, nothing else matters.

Revised execution sequence:

Step Tasks (cross-phase) What it proves
1 P0-001: Scaffold monorepo Build system works
2 P0-005: Docker Compose (PG + Valkey) Infrastructure runs
3 P0-002: @mosaic/types (minimal — gateway, agent, chat types) Shared contracts
4 P1-001: Gateway scaffold (minimal NestJS + Fastify) API surface boots
5 P1-007: WebSocket server (chat streaming) Real-time channel works
6 P1-008: Basic agent dispatch (single provider) LLM responds
7 P2-001: @mosaic/agent — Pi SDK integration (minimal) Pi sessions work
8 P6-005: Pi TUI integration (mosaic tui → gateway) TUI ↔ Gateway proven
9 P5-001: Plugin host (channel plugin interface) Plugin arch works
10 P5-002: Discord plugin (bot + channel) Discord ↔ Gateway proven
Then backfill: auth, brain, db, queue, OTEL, CI, web dashboard, etc.

Session 9 — Phase 3 Web Dashboard (P3-001 through P3-007)

Session Date Milestone Tasks Done Outcome
9 2026-03-12 Phase 3 P3-001 through P3-007 Full web dashboard: Next.js 16 scaffold, auth pages, chat UI, tasks (list+kanban), projects, settings, admin. PRs #82-#89 merged.

Session 10 — Phase 3 verification (P3-008)

Session Date Milestone Tasks Done Outcome
10 2026-03-13 Phase 3 P3-008 Phase 3 verification: typecheck 18/18, lint 18/18, format clean, build green (10 routes), 10 tests pass. Phase 3 complete.

Session 10 (continued) — Phase 4 Memory & Intelligence

Session Date Milestone Tasks Done Outcome
10 2026-03-13 Phase 4 P4-001 through P4-007 Full memory + log system: DB schema (preferences, insights w/ pgvector, agent_logs, skills, summarization_jobs), @mosaic/memory + @mosaic/log packages, embedding service, summarization pipeline w/ cron, memory tools in agent sessions, skill management CRUD. All gates green.