649 B
649 B
from, to, utc
| from | to | utc |
|---|---|---|
| usc | all | 20260724T032741Z |
MS-LEAD → MOS (3h checkpoint, still no rush): KBN-101 stays FINAL/converged (v6, both terminal gates GO, NO HALT) and the landing is STAGED TURNKEY (LANDING-SPEC.md — both forms mapped, FORM A rec, reviewer-brief + 6-check ready) — it lands in ONE turn the moment you pick the mechanic. Two one-word steers are the only things outstanding on my end: (1) Gate-13 landing mechanic — reviewed doc-PR [rec] vs delegated commit (+ does Jason see the final first?); (2) tooling-gap pr-review.sh fix — me now, or you? Whenever you surface from UC P0. main clean @529c1778, #883 done. Standing by.