Dewey's round 3 candidate, manifest
agents/dewey/work/queue-40/candidate-manifest-r3.sha256 (d0aa0ded,
27 files, checked OK in the canonical tree).
- WebUI inbox, tasks, agents and trail views, read-only over /api/bus.
The README says the bus proof ends at the Console process.
- CHAT-03 seal: the engine command is fixed, the engine environment is
explicit, SEAL_FLAGS has --no-approve, escalating is cleared on throw.
- Terminal input typed after Ctrl-T or Ctrl-O is held. Only the run whose
own parse set held drains it (T1), and #run catches errors per action.
- DEFERRED keeps N2 and moves F2 to done, citing T1.
Reviews: Filbert approve (comment 27011, rev 260), Darkwing approve
(27013, rev 264). Landing gate on 8cad7722 plus the candidate: webui 22,
conversation 161, control-board 124, every scripts/test-*.sh green,
test-task 98/0. Mutant Mr survives; its flows test is the first
follow-up row.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
3.4 KiB
Slice 1 S5: Gate E script (row 40, #1522; row 5, #1507)
Written 2026-10-09T23:28Z by Dewey. This replaces the draft in
SLICE1-VIEWS.md section 4, now that S3 and S4 have landed. Gate E is
Jason's: the demonstration with all seats, then his workday ruling (round 3,
7B). Live cutover needs its own approval. Model calls during the
demonstration are Jason's to start; no seat runs them for discovery.
What is ready, and what waits
| Step | Needs | State on 2026-10-09 |
|---|---|---|
| 1 Console, board and Agents | S4 human CLI, a bus host | ready |
| 2 A task appears in Tasks | S3 poller and Vikunja (tasks.mosaicstack.dev, project 32) | ready; the PM request itself waits on S6 |
| 3 A decision through the inbox | S4 mosaic decide |
ready |
| 4 Trail to review and close | S2 trail, S3 events | ready |
| 5 A conversation through CHAT-03 | the I3 seal and environment (this row); the controller entry point for the live PM session (S6) | the library is ready; a live session waits on S6 |
| 6 Workday ruling | all of the above | Jason |
Nothing in packages/ constructs a Controller outside the tests yet.
S6 is where the stack launches the PM session; this row makes the controller
safe to point at real Pi (the seal covers the command, the environment is
an explicit list).
Script
-
Start the bus host, the board and the Console, one terminal each:
scripts/mosaic bus start mosaic-stack node packages/control-board/src/cli.mjs serve node packages/webui/src/cli.mjs serveThe Console prints
Bus: the running bus host's business. Open http://127.0.0.1:7330/. The board shows the seats. Agents shows each held role with its holder and harness; the gap labels say what the Q1 module doesn't return yet. -
Send the PM a one-sentence request (with S6:
mosaic talk). Watch the task appear in Tasks with its requirement id within one poll. Open it: the snapshots say whether the stack wrote it or Vikunja was changed after. Edit the task in Vikunja and watch the badge change on the next poll. -
A gated decision reaches the inbox and the DM. Read it in Console, Copy the
mosaic decide <id> <key>line and run it in a terminal (it asks for confirmation unless--yes). The inbox row closes on the next refresh, and the decision page shows the resolution. -
From the task page, follow "Trail with filters" through review and close. Each event names who did it; a decision link goes back to the inbox page.
-
Drive a conversation through CHAT-03: connect the mediated terminal (
node packages/conversation/src/terminal.mjs --socket <path>), watch as an observer, take control with Ctrl-T, send, then let another client take it back. The composer clears on each transfer. -
Use Console for the rest of the workday, then rule on it. Pass is Jason's say-so, not a test result.
Evidence
- Browser runs against an in-process broker with real broker rows:
packages/webui/tests/bus-browser.test.mjs, screenshots underWEBUI_EVIDENCE. - The live run's screen captures, taken during the demonstration and kept
under
agents/dewey/work/wui/evidence/. - Anything that sent Jason to the board's own page, a terminal or Vikunja
instead of Console goes in
docs/plans/DEFERRED.md.
Rollback
Stop the WebUI. The board at 7331 and the CLI are unchanged. Revert the S5
commit to remove the views; there is no data to migrate. Decisions resolved
with mosaic decide belong to the bus and are not rolled back.