Files
stack/docs/plans
jason.woltjeandClaude Opus 5.5 1c5f6bc3a0 docs(queue): queue-as-data plan round 6, Rocko approved (#1508)
Plan 282fabbb (Filbert) and the six adversarial rounds (Rocko, r6 80cde839).
Lead item 15: Gate F first, then A1 and A2 as separate reviewed commits.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:05:16 -05:00
..