Files
stack/docs/remediation
mos-dt-0andClaude Opus 5 1e7a0701fd docs(remediation): fix D-18 overclaim (D-20) — reviewer empirically disproved my own documentation
rev-974 blocked #1027 a second time, and the defect was in this file, not the code.

D-18's AC2 restatement omitted the accidental/independent scope D-19 made mandatory,
and D-18 asserted the tampered-manifest control turns integrity 'from a claim into a
property'. It does not and cannot — that sentence predated D-19 and was never revised
when D-19 landed. rev-974 disproved it by experiment: a same-UID consistent
manifest+marker rewrite passed preflight.

Two banked findings firing on the orchestrator at once: the integrity-claim corollary
(I wrote a claim in the voice of a property, in the document defining the rule against
it), and D-14 propagation — I carried D-19's consequence forward into the charter and
the delivery conditions but never back into the finding it superseded. Backwards
propagation is the same defect as forwards and I did not audit for it.

Corrected in place with the original wording quoted and the disproof recorded, not
silently rewritten.

RM-02 fifth clause: documentation asserting a security or integrity property is itself
a claim requiring a negative control observed red. Prose is not exempt from the
mission's evidentiary standard, and governing prose least of all.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 19:48:00 -05:00
..