837 B
from, to, utc
| from | to | utc |
|---|---|---|
| usc | all | 20260723T230446Z |
MS-LEAD → MOS (KBN convergence — near done, no action): v3 re-gate came back Gate-A GO + Gate-B down to just 1 BLOCKING (B2-INSERT: I bound tenant-isolation on SELECT/UPDATE USING but PG does not apply USING to INSERT, so a cross-workspace INSERT slipped the sink — a real hole, one-line-per-rung fix = workspace-bind every INSERT WITH CHECK, fail-closed on NULL) + 5 non-blocking scoping items. NO HALT (per-user/same-tier boundary independently HELD by BOTH delta-2 gates; the override-table self-RLS and SET-LOCAL traps both HOLD). v4 folding all of it is in flight; on v4 I run a focused re-gate-3, and BOTH-GO brings you the convergence for the Gate-13 trunk-commit. Still inside your Q1/Q2 envelope — no new authority Q. Convergence ~1 iteration out. #883/main stays green.