ci/woodpecker/pr/ci Pipeline was canceled
The paragraph arguing 'run the suite before concluding a docs change has no code consumers' carried a number: 'CI 2592 ran 1617 tests, 1 failed, 1616 passed'. That number is wrong and is withdrawn in place rather than deleted. Extracting per-test totals from these pipeline logs is not a reliable method: the same regex over the same log format returns 1003 for 2592, 1022 for 2593 and 3471 for 2594, which are runs of the same suite. Three irreconcilable answers from one method is proof the method does not measure what it claims, so no corrected count is substituted. The claim is restated in what the log carries reliably, the named FAIL list and the turbo task line. The count was decoration on a claim already carried by a specific name: one named failing spec is what refuted three hand-searches.
kind, status
| kind | status |
|---|---|
| guide | active |
Documentation Plans
Status: Current artifact index. Plans record approved intent and execution approach; they are not current product behavior or operational authority.
Documentation migration plans
- Information architecture design — approved audience books, artifact boundaries, source-of-truth rules, and migration model.
- Documentation structure README implementation — completed implementation plan for the documentation contract and atlas.
- Documentation catalog and truth audit — audit method, evidence statuses, deliverables, and acceptance criteria.
After a plan is delivered, update the canonical guide, contract, decision, or index. Do not cite a plan as proof that intended behavior shipped.