Mos Connector Lease Operations — M1
Status: Held / non-operative. Operational authority: None. This page is a future runbook outline, not a current command, endpoint, migration, or activation procedure. Hold condition: The gateway's
DenyConnectorLeasePolicyremains the default policy and rejects every lease and grant operation. No connector is activated by this page.
Current state
M1 provides an implemented lease, fencing, audit, and gateway policy boundary. It does not currently provide an operator-facing lease endpoint, activate a connector, cut over a channel, or connect an existing runtime provider to ConnectorExecutionContext. The default gateway module is deny-all, so operators must not treat the schema or internal service as an available lease-control surface.
There is no current operator command sequence to acquire, renew, take over, release, or grant connector authority. Do not attempt to operate the held procedure through direct database writes or by bypassing the gateway policy. Any future activation requires a separately approved server-side policy, concrete adapter, downstream fencing design, and an updated operational runbook.
Held future procedure — not current command authority
The following records the intended shape of a later runbook. It is deliberately non-operative while deny-all remains:
Events and evidence to monitor later
If an authorized policy and adapter are activated in a future work package, correlation IDs may be used to inspect connector_lease_audit_log events:
| Event | Meaning |
|---|---|
acquire |
First holder inserted for an unused binding |
renew |
Current holder heartbeat extended the TTL |
takeover |
Authorized compare-and-swap replaced the holder and incremented epoch |
release |
Current holder explicitly relinquished authority |
expiry |
An expired current lease was observed |
reject |
Policy, compare-and-swap, expiry, scope, or fencing validation denied an operation |
Audit records are metadata-only. Raw grant objects, connector payloads, scopes, tokens, approval references, and credentials must never be added to audit output. The current schema does not independently enforce append-only storage; database-level protection remains a future hardening requirement.
Held incident-review outline
For a future suspected duplicate or stale connector effect, an approved operator procedure would:
- correlate the attempted operation with its
reject,takeover, orexpiryevent; - compare the durable row's connector ID, lease UUID, epoch, expiry, and release time with the adapter's normalized execution context;
- treat an old epoch, old lease UUID, expired lease, or released lease as non-authoritative rather than retrying it as the old holder;
- use only the authorized takeover path with the observed expected epoch, never ordinary acquire, for an expired or released row; and
- preserve evidence without assuming lease fencing provides exactly-once replay safety if an external effect may already have occurred.
These are held review requirements, not instructions to bypass the current deny-all policy.
Held migration and rollback notes
The checked-in 0016_salty_morlocks.sql artifact is additive: it creates the lease and audit tables and indexes without changing existing authorization/session tables. A future database rollout would still require the repository's approved migration, backup, verification, and rollback controls. Application rollback would leave additive lease/audit tables in place; dropping them would destroy evidence and is not an automatic rollback step.
This page does not authorize running migrations, connecting to PostgreSQL, initializing PGlite, or starting a connector. Those activities remain outside this held procedure and subject to repository/runtime gates.
Held security prerequisites
Before this page could become operative, the activation work would need to demonstrate at least:
- tenant authority derived from authenticated gateway context, not connector request fields;
- authorized policy decisions over normalized identity and scopes, with policy TTL handling based on the requested input and coordinator hard caps still applied;
- explicit takeover authorization and expected-epoch compare-and-swap;
- application-boundary normalization plus any separately approved database constraints or protections;
- validation and rejection audit before adapter side effects;
- a concrete adapter that consumes and propagates the normalized epoch/context; and
- existing authorization and exact-action approval controls remaining in force.
M1 currently satisfies the boundary contract and default-deny posture, not these activation prerequisites.
Explicit non-goals while held
This page does not authorize or claim:
- lease administration from the dashboard, CLI, HTTP, SQL console, or a connector;
- production connector or channel activation;
- exactly-once delivery, side-effect journaling, checkpoint/handoff recovery, or replay safety;
- automatic failover, rollback, or stale-effect recovery across Claude, Pi, Codex, Matrix, tmux, or provider sessions; or
- database-enforced audit immutability or database-enforced application normalization.
The page may be promoted to an operative runbook only after deny-all is intentionally replaced, concrete adapters are reviewed, activation evidence exists, and this hold is explicitly removed by the owning work package.