Files
stack/docs/TASKS.md
Jason Woltje 8be688bcdc
All checks were successful
ci/woodpecker/pr/ci Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
chore(orchestrator): complete Phase 6 milestone — v0.0.7
- P6-001 done: CLI subcommands (PR #104)
- P6-002 done: prdy migration (PR #101)
- P6-003 done: quality-rails migration (PR #100)
- P6-004 done: mosaic wizard migration (PR #103)
- P6-006 done: verification passed
- BUG-1/BUG-2 fixed (PR #102)
- Phase 6 complete, advancing to Phase 7

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-14 20:06:45 -05:00

7.5 KiB

Tasks — MVP

Single-writer: orchestrator only. Workers read but never modify.

id status milestone description pr notes
P0-001 done Phase 0 Scaffold monorepo #60 #1
P0-002 done Phase 0 @mosaic/types — migrate and extend shared types #65 #2
P0-003 done Phase 0 @mosaic/db — Drizzle schema and PG connection #67 #3
P0-004 done Phase 0 @mosaic/auth — BetterAuth email/password setup #68 #4
P0-005 done Phase 0 Docker Compose — PG 17, Valkey 8, SigNoz #65 #5
P0-006 done Phase 0 OTEL foundation — OpenTelemetry SDK setup #65 #6
P0-007 done Phase 0 CI pipeline — Woodpecker config #69 #7
P0-008 done Phase 0 Project docs — AGENTS.md, CLAUDE.md, README #69 #8
P0-009 done Phase 0 Verify Phase 0 — CI green, all packages build #70 #9
P1-001 done Phase 1 apps/gateway scaffold — NestJS + Fastify adapter #61 #10
P1-002 done Phase 1 Auth middleware — BetterAuth session validation #71 #11
P1-003 done Phase 1 @mosaic/brain — migrate from v0, PG backend #71 #12
P1-004 done Phase 1 @mosaic/queue — migrate from v0 #71 #13
P1-005 done Phase 1 Gateway routes — conversations CRUD + messages #72 #14
P1-006 done Phase 1 Gateway routes — tasks, projects, missions CRUD #72 #15
P1-007 done Phase 1 WebSocket server — chat streaming #61 #16
P1-008 done Phase 1 Basic agent dispatch — single provider #61 #17
P1-009 done Phase 1 Verify Phase 1 — gateway functional, API tested #73 #18
P2-001 done Phase 2 @mosaic/agent — Pi SDK integration + agent pool #61 #19
P2-002 done Phase 2 Multi-provider support — Anthropic + Ollama #74 #20
P2-003 done Phase 2 Agent routing engine — cost/capability matrix #75 #21
P2-004 done Phase 2 Tool registration — brain, queue, memory tools #76 #22
P2-005 done Phase 2 @mosaic/coord — migrate from v0, gateway integration #77 #23
P2-006 done Phase 2 Agent session management — tmux + monitoring #78 #24
P2-007 done Phase 2 Verify Phase 2 — multi-provider routing works #79 #25
P3-001 done Phase 3 apps/web scaffold — Next.js 16 + BetterAuth + Tailwind #82 #26
P3-002 done Phase 3 Auth pages — login, registration, SSO redirect #83 #27
P3-003 done Phase 3 Chat UI — conversations, messages, streaming #84 #28
P3-004 done Phase 3 Task management — list view + kanban board #86 #29
P3-005 done Phase 3 Project & mission views — dashboard + PRD viewer #87 #30
P3-006 done Phase 3 Settings — provider config, profile, integrations #88 #31
P3-007 done Phase 3 Admin panel — user management, RBAC #89 #32
P3-008 done Phase 3 Verify Phase 3 — web dashboard functional E2E #33
P4-001 done Phase 4 @mosaic/memory — preference + insight stores #34
P4-002 done Phase 4 Semantic search — pgvector embeddings + search API #35
P4-003 done Phase 4 @mosaic/log — log ingest, parsing, tiered storage #36
P4-004 done Phase 4 Summarization pipeline — Haiku-tier LLM + cron #37
P4-005 done Phase 4 Memory integration — inject into agent sessions #38
P4-006 done Phase 4 Skill management — catalog, install, config #39
P4-007 done Phase 4 Verify Phase 4 — memory + log pipeline working #40
P5-001 done Phase 5 Plugin host — gateway plugin loading + channel interface #41
P5-002 done Phase 5 @mosaic/discord-plugin — Discord bot + channel plugin #61 #42
P5-003 done Phase 5 @mosaic/telegram-plugin — Telegraf bot + channel plugin #43
P5-004 done Phase 5 SSO — Authentik OIDC adapter end-to-end #44
P5-005 done Phase 5 Verify Phase 5 — Discord + Telegram + SSO working #99 #45
P6-001 done Phase 6 @mosaic/cli — unified CLI binary + subcommands #104 #46
P6-002 done Phase 6 @mosaic/prdy — migrate PRD wizard from v0 #101 #47
P6-003 done Phase 6 @mosaic/quality-rails — migrate scaffolder from v0 #100 #48
P6-004 done Phase 6 @mosaic/mosaic — install wizard for v1 #103 #49
P6-005 done Phase 6 Pi TUI integration — mosaic tui #61 #50
P6-006 done Phase 6 Verify Phase 6 — CLI functional, all subcommands #51
P7-001 not-started Phase 7 MCP endpoint hardening — streamable HTTP transport #52
P7-002 not-started Phase 7 Additional SSO providers — WorkOS + Keycloak #53
P7-003 not-started Phase 7 Additional LLM providers — Codex, Z.ai, LM Studio, llama.cpp #54
P7-004 not-started Phase 7 E2E test suite — Playwright critical paths #55
P7-005 not-started Phase 7 Performance optimization #56
P7-006 not-started Phase 7 Documentation — user guide, admin guide, dev guide #57
P7-007 not-started Phase 7 Bare-metal deployment docs + .env.example #58
P7-008 not-started Phase 7 Beta release gate — v0.1.0 tag #59
FIX-01 done Backlog Call piSession.dispose() in AgentService.destroySession #78 #62
FIX-02 not-started Backlog TUI agent:end — fix React state updater side-effect #63
FIX-03 not-started Backlog Agent session — cwd sandbox, system prompt, tool restrictions #64