ci/woodpecker/pr/ci Pipeline was successful
The Applied table carried 107 stamped and 17 held, the counts from the first pass, with nothing telling a reader they had moved. The re-closed arithmetic at the end of the document was already correct, so the document was not wrong overall, but a reader hitting the table got a stale count with no forward pointer. In this PR specifically that is the defect the PR exists to remove, appearing in the PR's own worklist. The first-pass numbers are left standing and labelled rather than overwritten, matching every other correction in this document: a record of what a pass produced is worth more than a number silently updated to still look right. The current census follows it, re-measured: 108 stamped + 16 + 3 + 1 = 128, kinds 54 guide / 34 record / 13 spec / 7 tracking, status 106 active / 2 completed, and the two files carrying source_of_truth: true named.
kind, status
| kind | status |
|---|---|
| guide | active |
Documentation Plans
Status: Current artifact index. Plans record approved intent and execution approach; they are not current product behavior or operational authority.
Documentation migration plans
- Information architecture design — approved audience books, artifact boundaries, source-of-truth rules, and migration model.
- Documentation structure README implementation — completed implementation plan for the documentation contract and atlas.
- Documentation catalog and truth audit — audit method, evidence statuses, deliverables, and acceptance criteria.
After a plan is delivered, update the canonical guide, contract, decision, or index. Do not cite a plan as proof that intended behavior shipped.