#1019 — Zero-timeout queue-guard harness race

  • Issue: #1019 (parent status remains believed-fixed, pending jarvis validation; do not close)
  • Branch: fix/1019-ci-queue-timeout-harness
  • Owner: be-coder-08
  • Base: origin/main at 5916aeefd6ed12bcac086c6834c7f6c4ae38e1bc
  • Charter: /home/hermes/agent-work/tl-mosaic/CHARTER-1019-HARNESS-FIX.md

Objective

Make test-ci-queue-wait-tristate.sh deterministic without changing any asserted outcome. Remove the indiscriminate zero-timeout race, require every status-classification case to prove the provider was observed, and prove the harness-controlled virtual clock is active.

Scope

  • In scope: packages/mosaic/framework/tools/git/test-ci-queue-wait-tristate.sh only, plus this evidence scratchpad.
  • Out of scope: guard parsers, D2/D3 behavior, installer/reseed staleness, PR #1060, and issue closure.

Acceptance criteria

  1. RED deterministically reproduces deadline pre-emption before the provider call.
  2. Every case that intends status classification positively proves provider observation.
  3. Pending observes pending before deterministic virtual-time expiration.
  4. The virtual clock has a positive interception control; a broken-clock mutant makes the suite red.
  5. The exact CI-base image passes the final harness repeatedly with zero failures.
  6. Baseline gates, independent code/security review, exact-head CI, and coordinator-authorized squash merge pass.

Plan

  1. Add deterministic RED instrumentation for the known merge/provider-unreachable pre-emption.
  2. Replace global -t 0 with a nonzero timeout interpreted under an event-driven virtual clock; stub sleep without wall waiting.
  3. Add provider-observation and virtual-clock positive controls without changing outcome assertions.
  4. Run focused shell checks, repeat in exact CI-base image, baseline gates, and independent reviews.
  5. Commit with both identity layers, queue-guard plus direct Woodpecker terminal-state verification, push, self-post PR, verify poster/head/CI, obtain coordinator merge authorization, then squash merge without closing #1019.

Budget

  • No explicit token cap supplied. Keep scope to one harness file and one scratchpad; stop/report at the charter's 60% context gate.

Evidence

  • RED, deterministic pre-provider expiry: evidence/1019-harness-fix/red-pre-provider-expiry.log — rc 1; merge/provider-unreachable got rc 124 instead of 75, omitted CANNOT_ASSERT, did not observe the status provider, and wrote no additional audit record (four named failures).
  • GREEN host focused harness: evidence/1019-harness-fix/green-host.log — rc 0, all outcome classes passed.
  • Load-bearing clock negative control: a temporary same-directory mutant replaced the virtual date body with /bin/date; evidence/1019-harness-fix/red-clock-not-intercepted.log — rc 1 with named virtual clock interception did not run failures. The mutant file was removed after the run.
  • Exact CI-base repeat: git.mosaicstack.dev/mosaicstack/stack/ci-base:latest, repository mounted read-only, harness work under container /tmp; evidence/1019-harness-fix/ci-image-repeat/summary.log100 pass / 0 fail / 100 total.
  • Synchronization design: provider-status observation creates the event marker; virtual time is 1000 before the event and 2000 afterward. Pending alone reaches the stubbed no-op sleep and a post-observation deadline check. -t 1 is numeric subject semantics under virtual time, not a wall-clock synchronization duration.

60% context hold

Stopped before baseline/review/commit as required by the charter. Remaining: inspect final diff, shell/static/baseline gates, independent code/security review, remediation if any, identity-bound commit/trailer verification, mandatory queue guard plus direct terminal Woodpecker mosaic enumeration, push, self-posted PR/provider poster read-back, exact-head terminal-green CI, coordinator merge authorization, squash merge, main CI verification, and leave #1019 unclosed as believed-fixed, pending jarvis validation.