ci/woodpecker/pr/ci Pipeline failed
17 content commits + 3 merge bubbles were genuinely missing from next (~8,000 lines: goal controller #1152, framework enforcement #1174/#1195, pr-edit wrapper #1173/#1200, pipefail series #1100/#1105/#1106/#1107, git-tools fixes #1073/#1085/#1086/#1089, #991, #1007, enrollment tolerance #1094). 3 commits were already in next by content (#1060 identical, #1066/#1062 evolved twins — conflicts resolved to next's side). Per-commit classification and evidence: mosaic-brain fleet/lanes/stack-remediation/main-next-divergence.md. Conflict resolutions (6 files) itemized in the PR body.
Documentation Reports
Status: Current evidence index. Reports record reviews, tests, audits, and deferred findings; they are not requirements or operational instructions by themselves.
Use the canonical guide, API contract, source, and tests to determine current behavior. A report retains the scope and verdict of its original review unless a later report explicitly supersedes it.
Documentation evidence
- Documentation catalog and truth audit — migration inventory and static truth assessment.
- Fleet documentation IA closure — active Fleet documentation acceptance evidence; the executable book remains at
docs/fleet/. - Fleet documentation deferrals — explicit holds and deferred live-action boundaries.
- Issue #756 documentation checklist — historical completion checklist for the official Discord plugin workstream.
- Framework consistency audit — 2026-02-17 — historical framework consistency and remediation snapshot.
- Compaction-refresh #830 checklist — historical incomplete-at-snapshot documentation checklist.
Code-review evidence
- Issue #756 independent code review — historical exact-scope review of the official Discord plugin workstream.
- Gateway security-hardening code review — 2026-03-13 — historical no-blocker review snapshot.
Security evidence
- Issue #756 security review — historical security review of Discord ingress, authorization, routing, and residual risks.
QA evidence
- P8-003 performance optimization report — historical implementation evidence; not a current SLO or production benchmark.
- Gateway security-hardening QA report — 2026-03-13 — historical test report with its original live-smoke-test limitation.
Native Kanban/SOT evidence
These reports preserve the review sequence for issue #751. Their GO verdicts apply only to the reviewed historical scope and do not decide current Kanban authority or authorize held KBN-101 database work.
- Initial independent NO-GO — original blocking review.
- Independent re-review GO — follow-up closure review.
- Ultron final GO — historical final-gate record.
- KBN-101 security/architecture review — active review evidence coupled to the held KBN-101 authority surface.
Retention rules
- Preserve report wording and verdicts when migrating historical evidence.
- Keep the reviewed commit, issue, scope, and date visible when present.
- Do not treat an old approval as approval of later code.
- Link each tracked report from this index or an explicitly scoped child index.
- Put current operator procedures in the administrator guide, not in reports.