Files
stack/scratchpads/ri-4-001-prd-authority.md
T
fargoandjarvis d92de53399
ci/woodpecker/push/publish Pipeline was canceled
feat(prd): one transitional PRD authority — RI-4-001 (#1275) (#1294)
Co-authored-by: fargo <[email protected]>
2026-08-18 05:56:51 +00:00

2.5 KiB

Scratchpad — RI-4-001 One transitional PRD authority (RI-N3, #1275)

  • Objective: single PrdService authority in @mosaicstack/prdy; mosaic prdy and mission --plan become thin adapters; mission↔PRD linkage persisted on disk; Markdown export is a labeled generated view (never read back); import is validated/conflict-aware with typed refusals.
  • Budget: ~35K tokens (card cap). Baselines: prdy build/lint rc=0, 0 tests; mosaic build rc=0 (after root turbo build), lint rc=0, 1548 tests pass; root build rc=0.
  • Plan: (1) extend store schema (version, missions linkage) (2) PrdService + typed errors (3) wizard/cli route through service (4) mosaic adapters (5) contract specs both packages (6) gates (7) sabotage control (8) report to /var/tmp/ri-050/ri-4-001-report.md.
  • Decisions:
    • Linkage lives ON the PRD document (missions array) — one authority file, survives restart, no sidecar sync problems.
    • version = content revision of sections/status (bumped by update/import accept). Linkage writes bump updatedAt only, so ids/versions stay stable for the card's "stable ids/versions" contract.
    • Mission version marker = mission.updatedAt (gateway MissionInfo has no numeric version field).
    • Import reads YAML documents only — never the exported Markdown (keeps the "no code path reads exported Markdown" invariant).
    • Import of an existing id with identical core content → identical no-op; divergent → typed PrdImportConflictError carrying proposed successor (existing.version + 1, status draft, linkages preserved). Original bytes untouched until explicit acceptSuccessor.
    • requirementIds default [] at the mission command (no requirement selection UI yet) — service accepts ids when a caller has them.
  • Progress log:
    • [16:35] baselines captured (prdy 0 tests; mosaic 1548 after root build; root build rc=0)
    • [16:38] store schema v2 + PrdService + wizard/cli rerouted; prdy build/lint green
    • [16:40] mosaic adapters done; prdy spec 20/20 (found+fixed: import project-path leak, empty-store typed error, YAML timestamp coercion)
    • [16:44] mosaic specs 9/9 (fixed commander from:'user' argv, vi.mock hoisting, restoreAllMocks wiping factory mocks)
    • [16:45] all gates green; 4 commits (e291bfb, 2c5d208, a23826c, 540d6f1)
    • [16:46] sabotage: linkage write removed → prdy 3 fail / mosaic 2 fail, 1548/1548 pre-existing pass; restored byte-identically; re-green 20/20 + 1557/1557
    • [16:47] report written to /var/tmp/ri-050/ri-4-001-report.md — card complete