Some checks failed
ci/woodpecker/pr/ci Pipeline was canceled
All 10 TESS-M1 tasks merged to main (SEC-001..006 + M1-001/002/003 + OBS-001); mark each done with PR/head/ROR evidence. TESS-M1-V set to in-progress and owned by Mos (Mos runs the M1->M2 gate review directly via its own independent non-author reviewer; orchestrator does not dispatch a competing lane). Record the Mos-locked base=main convention. Refs #707