Files
stack/docs/scratchpads/prd-implementation-20260222.md
2026-02-23 05:09:04 +00:00

5.3 KiB

Mission Scratchpad — PRD implementation

Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.

Original Mission Prompt

Active mission detected: PRD implementation. Read the mission state files and report status.
User instruction: start planning. Be complete and thorough.

Planning Decisions

2026-02-22 — Task Breakdown

Decision: Combined MS16 (Pages) and MS17 (Backend Integration) into a single milestone because 19 backend API modules with 42 controllers already exist. Work is primarily frontend page creation and API wiring.

Task structure: 15 tasks across 4 phases:

  • Phase 1 (Foundation): 404 page + Settings root — quick wins to fill navigation gaps
  • Phase 2 (Mock Elimination): Wire tasks/calendar/knowledge to real APIs
  • Phase 3 (New Pages): Projects, Workspace, Kanban, File Manager, Logs, Profile — the bulk of new work
  • Phase 4 (Verification): Theme/responsive check, docs, deploy + smoke test

Branch strategy: One feature branch per task, PR to main, squash merge.

Dependency rationale:

  • PG-PAGE-002 (Workspace) depends on PG-PAGE-001 (Projects) — workspace shows single project detail, needs project list/selection pattern established first
  • PG-PAGE-003 (Kanban) depends on PG-API-001 (Tasks API wiring) — Kanban needs the tasks API client to be working with real data before building the board UI
  • Phase 4 tasks are sequential: verification → docs → deploy

Codebase findings (from exploration):

  • TaskStatus enum: NOT_STARTED, IN_PROGRESS, PAUSED, COMPLETED, ARCHIVED (5 Kanban columns)
  • Mock data locations: apps/web/src/lib/api/tasks.ts, events.ts, knowledge.ts, client.ts
  • API client pattern: apiGet<T>(), apiPost<T>(), etc. with CSRF + workspace headers
  • 17 shared UI components in packages/ui (Button, Card, Badge, Input, Modal, DataTable, etc.)
  • Sidebar nav defined in apps/web/src/components/layout/AppSidebar.tsx — all links already point to correct routes
  • Design tokens in apps/web/src/app/globals.css with full light/dark support

Estimate: ~320K tokens total across all tasks.

Issues created: #466 (Phase 1), #467 (Phase 2), #468 (Phase 3), #469 (Phase 4) Milestone: MS16+MS17-PagesDataIntegration (Gitea)

Profile Page Addition

Decision: Added PG-PAGE-006 (Profile page) — PRD FR-003 notes "profile page navigation pending (MS16)" and the sidebar user card should link to it. Included in Phase 3.

Session Log

Session Date Milestone Tasks Done Outcome
S1 2026-02-22 MS16+MS17 PG-PLAN-001 Planning complete — milestone created, 4 issues created (#466-#469), 15 tasks populated in TASKS.md
S1 2026-02-22 MS16+MS17 PG-FND-001 to PG-VER-001 13 implementation tasks completed. PRs #470-#483 merged. 3 test failures fixed. All 5125 tests pass.
S2 2026-02-22 MS16+MS17 PG-DOC-001 Documentation updates — PRD statuses, manifest, scratchpad, TASKS.md.

Open Questions (Resolved)

  1. Kanban DnD library: RESOLVED — @hello-pangea/dnd selected (maintained fork of react-beautiful-dnd, better TS support)
  2. Workspace page default view: RESOLVED — Shows project selector when no project param, workspace detail when ?project=id
  3. File Manager vs Knowledge: RESOLVED — File Manager maps directly to Knowledge entries via /api/knowledge. API shape matches UI needs.

Execution Summary

PRs Merged (14 total)

PR Task Description
#470 PG-PLAN-001 Planning artifacts (TASKS.md, manifest, scratchpad)
#471 PG-FND-002 Settings root page — 4 category cards
#472 PG-FND-001 Custom 404 pages (global + authenticated)
#473 PG-API-001 Tasks page wired to real API
#474 PG-API-002 Calendar page wired to real API
#475 PG-API-001 Tasks API updateTask function
#476 PG-API-003 Knowledge pages wired to real API (238 lines mock removed)
#477 PG-PAGE-001 Projects list page (809 lines)
#478 PG-PAGE-003 Kanban board with DnD
#479 PG-PAGE-002 Project workspace with tabs
#480 PG-PAGE-005 Logs & telemetry page
#481 PG-PAGE-004 File manager page
#482 PG-PAGE-006 Profile page
#483 PG-VER-001 Test fixes (3 failures resolved, 5125 pass)

Issues Closed

  • #466 (Phase 1: Foundation pages)
  • #467 (Phase 2: Mock elimination)
  • #468 (Phase 3: New pages)
  • #469 — pending closure after deploy

Corrections

(none)