All FR-008 through FR-015 marked COMPLETE with PR references. Manifest updated with S2 session. Scratchpad includes full execution summary with all 14 merged PRs and resolved open questions. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
97 lines
5.3 KiB
Markdown
97 lines
5.3 KiB
Markdown
# Mission Scratchpad — PRD implementation
|
|
|
|
> Append-only log. NEVER delete entries. NEVER overwrite sections.
|
|
> This is the orchestrator's working memory across sessions.
|
|
|
|
## Original Mission Prompt
|
|
|
|
```
|
|
Active mission detected: PRD implementation. Read the mission state files and report status.
|
|
User instruction: start planning. Be complete and thorough.
|
|
```
|
|
|
|
## Planning Decisions
|
|
|
|
### 2026-02-22 — Task Breakdown
|
|
|
|
**Decision**: Combined MS16 (Pages) and MS17 (Backend Integration) into a single milestone because 19 backend API modules with 42 controllers already exist. Work is primarily frontend page creation and API wiring.
|
|
|
|
**Task structure**: 15 tasks across 4 phases:
|
|
|
|
- Phase 1 (Foundation): 404 page + Settings root — quick wins to fill navigation gaps
|
|
- Phase 2 (Mock Elimination): Wire tasks/calendar/knowledge to real APIs
|
|
- Phase 3 (New Pages): Projects, Workspace, Kanban, File Manager, Logs, Profile — the bulk of new work
|
|
- Phase 4 (Verification): Theme/responsive check, docs, deploy + smoke test
|
|
|
|
**Branch strategy**: One feature branch per task, PR to main, squash merge.
|
|
|
|
**Dependency rationale**:
|
|
|
|
- PG-PAGE-002 (Workspace) depends on PG-PAGE-001 (Projects) — workspace shows single project detail, needs project list/selection pattern established first
|
|
- PG-PAGE-003 (Kanban) depends on PG-API-001 (Tasks API wiring) — Kanban needs the tasks API client to be working with real data before building the board UI
|
|
- Phase 4 tasks are sequential: verification → docs → deploy
|
|
|
|
**Codebase findings** (from exploration):
|
|
|
|
- TaskStatus enum: NOT_STARTED, IN_PROGRESS, PAUSED, COMPLETED, ARCHIVED (5 Kanban columns)
|
|
- Mock data locations: `apps/web/src/lib/api/tasks.ts`, `events.ts`, `knowledge.ts`, `client.ts`
|
|
- API client pattern: `apiGet<T>()`, `apiPost<T>()`, etc. with CSRF + workspace headers
|
|
- 17 shared UI components in packages/ui (Button, Card, Badge, Input, Modal, DataTable, etc.)
|
|
- Sidebar nav defined in `apps/web/src/components/layout/AppSidebar.tsx` — all links already point to correct routes
|
|
- Design tokens in `apps/web/src/app/globals.css` with full light/dark support
|
|
|
|
**Estimate**: ~320K tokens total across all tasks.
|
|
|
|
**Issues created**: #466 (Phase 1), #467 (Phase 2), #468 (Phase 3), #469 (Phase 4)
|
|
**Milestone**: MS16+MS17-PagesDataIntegration (Gitea)
|
|
|
|
### Profile Page Addition
|
|
|
|
**Decision**: Added PG-PAGE-006 (Profile page) — PRD FR-003 notes "profile page navigation pending (MS16)" and the sidebar user card should link to it. Included in Phase 3.
|
|
|
|
## Session Log
|
|
|
|
| Session | Date | Milestone | Tasks Done | Outcome |
|
|
| ------- | ---------- | --------- | ------------------------ | ---------------------------------------------------------------------------------------------------- |
|
|
| S1 | 2026-02-22 | MS16+MS17 | PG-PLAN-001 | Planning complete — milestone created, 4 issues created (#466-#469), 15 tasks populated in TASKS.md |
|
|
| S1 | 2026-02-22 | MS16+MS17 | PG-FND-001 to PG-VER-001 | 13 implementation tasks completed. PRs #470-#483 merged. 3 test failures fixed. All 5125 tests pass. |
|
|
| S2 | 2026-02-22 | MS16+MS17 | PG-DOC-001 | Documentation updates — PRD statuses, manifest, scratchpad, TASKS.md. |
|
|
|
|
## Open Questions (Resolved)
|
|
|
|
1. **Kanban DnD library**: RESOLVED — @hello-pangea/dnd selected (maintained fork of react-beautiful-dnd, better TS support)
|
|
2. **Workspace page default view**: RESOLVED — Shows project selector when no project param, workspace detail when ?project=id
|
|
3. **File Manager vs Knowledge**: RESOLVED — File Manager maps directly to Knowledge entries via /api/knowledge. API shape matches UI needs.
|
|
|
|
## Execution Summary
|
|
|
|
### PRs Merged (14 total)
|
|
|
|
| PR | Task | Description |
|
|
| ---- | ----------- | ---------------------------------------------------------- |
|
|
| #470 | PG-PLAN-001 | Planning artifacts (TASKS.md, manifest, scratchpad) |
|
|
| #471 | PG-FND-002 | Settings root page — 4 category cards |
|
|
| #472 | PG-FND-001 | Custom 404 pages (global + authenticated) |
|
|
| #473 | PG-API-001 | Tasks page wired to real API |
|
|
| #474 | PG-API-002 | Calendar page wired to real API |
|
|
| #475 | PG-API-001 | Tasks API updateTask function |
|
|
| #476 | PG-API-003 | Knowledge pages wired to real API (238 lines mock removed) |
|
|
| #477 | PG-PAGE-001 | Projects list page (809 lines) |
|
|
| #478 | PG-PAGE-003 | Kanban board with DnD |
|
|
| #479 | PG-PAGE-002 | Project workspace with tabs |
|
|
| #480 | PG-PAGE-005 | Logs & telemetry page |
|
|
| #481 | PG-PAGE-004 | File manager page |
|
|
| #482 | PG-PAGE-006 | Profile page |
|
|
| #483 | PG-VER-001 | Test fixes (3 failures resolved, 5125 pass) |
|
|
|
|
### Issues Closed
|
|
|
|
- #466 (Phase 1: Foundation pages)
|
|
- #467 (Phase 2: Mock elimination)
|
|
- #468 (Phase 3: New pages)
|
|
- #469 — pending closure after deploy
|
|
|
|
## Corrections
|
|
|
|
(none)
|