All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
195 lines
5.2 KiB
Markdown
195 lines
5.2 KiB
Markdown
# Gantt Chart Implementation Summary
|
|
|
|
## Issue
|
|
|
|
**#15: Implement Gantt Chart Component**
|
|
|
|
- Repository: https://git.mosaicstack.dev/mosaic/stack/issues/15
|
|
- Milestone: M3-Features (0.0.3)
|
|
- Priority: P0
|
|
|
|
## Implementation Complete ✅
|
|
|
|
### Files Created/Modified
|
|
|
|
#### Component Files
|
|
|
|
1. **`apps/web/src/components/gantt/GanttChart.tsx`** (299 lines)
|
|
- Main Gantt chart component
|
|
- Timeline visualization with task bars
|
|
- Status-based color coding
|
|
- Interactive task selection
|
|
- Accessible with ARIA labels
|
|
|
|
2. **`apps/web/src/components/gantt/types.ts`** (95 lines)
|
|
- Type definitions for GanttTask, TimelineRange, etc.
|
|
- Helper functions: `toGanttTask()`, `toGanttTasks()`
|
|
- Converts base Task to GanttTask with start/end dates
|
|
|
|
3. **`apps/web/src/components/gantt/index.ts`** (7 lines)
|
|
- Module exports
|
|
|
|
#### Test Files
|
|
|
|
4. **`apps/web/src/components/gantt/GanttChart.test.tsx`** (401 lines)
|
|
- 22 comprehensive component tests
|
|
- Tests rendering, interactions, accessibility, edge cases
|
|
- Tests PDA-friendly language
|
|
|
|
5. **`apps/web/src/components/gantt/types.test.ts`** (204 lines)
|
|
- 11 tests for helper functions
|
|
- Tests type conversions and edge cases
|
|
|
|
#### Demo Page
|
|
|
|
6. **`apps/web/src/app/demo/gantt/page.tsx`** (316 lines)
|
|
- Interactive demo with sample project data
|
|
- Shows 7 sample tasks with various statuses
|
|
- Task selection and details display
|
|
- Statistics dashboard
|
|
|
|
### Test Results
|
|
|
|
```
|
|
✓ All 33 tests passing (100%)
|
|
- 22 component tests
|
|
- 11 helper function tests
|
|
|
|
Coverage: 96.18% (exceeds 85% requirement)
|
|
- GanttChart.tsx: 97.63%
|
|
- types.ts: 91.3%
|
|
- Overall gantt module: 96.18%
|
|
```
|
|
|
|
### Features Implemented
|
|
|
|
#### Core Features ✅
|
|
|
|
- [x] Task name, start date, end date display
|
|
- [x] Visual timeline bars
|
|
- [x] Status-based color coding
|
|
- Completed: Green
|
|
- In Progress: Blue
|
|
- Paused: Yellow
|
|
- Not Started: Gray
|
|
- Archived: Light Gray
|
|
- [x] Interactive task selection (onClick callback)
|
|
- [x] Responsive design with customizable height
|
|
|
|
#### PDA-Friendly Design ✅
|
|
|
|
- [x] "Target passed" instead of "OVERDUE"
|
|
- [x] "Approaching target" for near-deadline tasks
|
|
- [x] Non-judgmental, supportive language throughout
|
|
|
|
#### Accessibility ✅
|
|
|
|
- [x] Proper ARIA labels for all interactive elements
|
|
- [x] Keyboard navigation support (Tab + Enter)
|
|
- [x] Screen reader friendly
|
|
- [x] Semantic HTML structure
|
|
|
|
#### Technical Requirements ✅
|
|
|
|
- [x] Next.js 16 + React 19
|
|
- [x] TypeScript with strict typing (NO `any` types)
|
|
- [x] TailwindCSS + Shadcn/ui patterns
|
|
- [x] Follows `~/.claude/agent-guides/frontend.md`
|
|
- [x] Follows `~/.claude/agent-guides/typescript.md`
|
|
|
|
#### Testing (TDD) ✅
|
|
|
|
- [x] Tests written FIRST before implementation
|
|
- [x] 96.18% coverage (exceeds 85% requirement)
|
|
- [x] All edge cases covered
|
|
- [x] Accessibility tests included
|
|
|
|
### Dependencies (Stretch Goals)
|
|
|
|
- [ ] Visual dependency lines (planned for future)
|
|
- [ ] Drag-to-resize task dates (planned for future)
|
|
|
|
_Note: Dependencies infrastructure is in place (tasks can have `dependencies` array), but visual rendering is not yet implemented. The `showDependencies` prop is accepted and ready for future implementation._
|
|
|
|
### Integration
|
|
|
|
The component integrates seamlessly with existing Task model from Prisma:
|
|
|
|
```typescript
|
|
// Convert existing tasks to Gantt format
|
|
import { toGanttTasks } from '@/components/gantt';
|
|
|
|
const tasks: Task[] = await fetchTasks();
|
|
const ganttTasks = toGanttTasks(tasks);
|
|
|
|
// Use the component
|
|
<GanttChart
|
|
tasks={ganttTasks}
|
|
onTaskClick={(task) => console.log(task)}
|
|
height={500}
|
|
/>
|
|
```
|
|
|
|
### Demo
|
|
|
|
View the interactive demo at: **`/demo/gantt`**
|
|
|
|
The demo includes:
|
|
|
|
- 7 sample tasks representing a typical project
|
|
- Various task statuses (completed, in-progress, paused, not started)
|
|
- Statistics dashboard
|
|
- Task selection and detail view
|
|
- Toggle for dependencies (UI placeholder)
|
|
|
|
### Git Commit
|
|
|
|
```
|
|
Branch: feature/15-gantt-chart
|
|
Commit: 9ff7718
|
|
Message: feat(#15): implement Gantt chart component
|
|
```
|
|
|
|
### Next Steps
|
|
|
|
1. **Merge to develop** - Ready for code review
|
|
2. **Integration testing** - Test with real task data from API
|
|
3. **Future enhancements:**
|
|
- Implement visual dependency lines
|
|
- Add drag-to-resize functionality
|
|
- Add task grouping by project
|
|
- Add zoom controls for timeline
|
|
- Add export to image/PDF
|
|
|
|
## Blockers/Decisions
|
|
|
|
### No Blockers ✅
|
|
|
|
All requirements met without blockers.
|
|
|
|
### Decisions Made:
|
|
|
|
1. **Start/End Dates**: Used `metadata.startDate` for flexibility. If not present, falls back to `createdAt`. This avoids schema changes while supporting proper Gantt visualization.
|
|
|
|
2. **Dependencies**: Stored in `metadata.dependencies` as string array. Visual rendering deferred to future enhancement.
|
|
|
|
3. **Timeline Range**: Auto-calculated from task dates with 5% padding for better visualization.
|
|
|
|
4. **Color Scheme**: Based on existing TaskItem component patterns for consistency.
|
|
|
|
5. **Accessibility**: Full ARIA support with keyboard navigation as first-class feature.
|
|
|
|
## Summary
|
|
|
|
✅ **Complete** - Gantt chart component fully implemented with:
|
|
|
|
- 96.18% test coverage (33 tests passing)
|
|
- PDA-friendly language
|
|
- Full accessibility support
|
|
- Interactive demo page
|
|
- Production-ready code
|
|
- Strict TypeScript (no `any` types)
|
|
- Follows all coding standards
|
|
|
|
Ready for code review and merge to develop.
|