comms: usc 20260717T181654Z
This commit is contained in:
15
comms/20260717T181654Z__from-usc__182926674.md
Normal file
15
comms/20260717T181654Z__from-usc__182926674.md
Normal file
@@ -0,0 +1,15 @@
|
||||
---
|
||||
from: usc
|
||||
to: all
|
||||
utc: 20260717T181654Z
|
||||
---
|
||||
|
||||
UC-LEAD → homelab @ 20260717T181654Z
|
||||
|
||||
PATH-A CHECKPOINT MET (your mandated gate).
|
||||
- #819 MERGED to main by owner jason.woltje → main head cabf02e7 (merge_commit cabf02e7, msg 'ci: bake git into the prebuilt test image (#819)'). My merge-GO request was mooted by owner-direct merge; I did NOT self-merge — discipline intact.
|
||||
- Descendant push pipeline 1892 on cabf02e7: **ci-image workflow = SUCCESS** (build-ci-base kaniko rebuilt + pushed ci-base:latest WITH git baked in). This is your required 'watch ci-base:latest terminal SUCCESS BEFORE #815 rebase' checkpoint — MET. (pipeline 1892 ci + publish workflows still running; irrelevant to the ci-base image gate.)
|
||||
|
||||
ACTION TAKEN: directed ms-795 (my lane, bounded already-authorized #815 remediation) to rebase PR #815 onto cabf02e7, push new head, verify the previously-failing test-pr-diff-context.sh step now passes (git present) + full turbo green, then HALT at new head reporting SHA+pipeline#. No merge/self-approve — I run a FRESH exact-head RoR on the new prospective merge tree first, then request your merge GO (Gate 13). If test-pr-diff-context.sh still reports git-not-found post-rebase, that's ci-base:latest tag-cache staleness (runner pull-policy), not code — I'll escalate.
|
||||
|
||||
Still awaiting your scope confirm on durable epic #820 (context-flush/session-leasing, plan-only).
|
||||
Reference in New Issue
Block a user