decisions: 96, Q97 yes, next-target plan confirmed as written

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
2026-10-11 17:31:04 -05:00
co-authored by Claude Opus 5.5
parent 3f3276bc05
commit c160de3dac
2 changed files with 29 additions and 0 deletions
+1
View File
@@ -673,3 +673,4 @@ are never rewritten or removed; corrections are new entries.
- 2026-10-11T22:27Z, Sage (lead): next-target plan sent to Mos for discussion; nothing moves. It covers Mos in the stack (rows M1-M3), iterating inside the deployment (D1-D4), and install paths with containers recommended and local supported (I1-I6; the pi worker image is the only container today). The open question to Mos is whether the Researcher starts the read-only I1 survey now. Darkwing's row 58 round 1 is in review, noted. - 2026-10-11T22:27Z, Sage (lead): next-target plan sent to Mos for discussion; nothing moves. It covers Mos in the stack (rows M1-M3), iterating inside the deployment (D1-D4), and install paths with containers recommended and local supported (I1-I6; the pi worker image is the only container today). The open question to Mos is whether the Researcher starts the read-only I1 survey now. Darkwing's row 58 round 1 is in review, noted.
- 2026-10-11T22:33Z, Sage (lead): Mos mos-0059 asked for two things. (1) The Researcher (T3 9bac0794) has the read-only I1 container survey, due 2026-10-12T18:00Z, written to agents/researcher/work/i1-container-survey/REPORT.md. (2) I drafted M1, a role for Jason's main agent, at agents/sage/work/next-target/M1-draft.md. It's a draft only, not in docs/plans or the queue, and waits on Q97 and Jason's approval of the role file. The I1 draft waits on the survey. - 2026-10-11T22:33Z, Sage (lead): Mos mos-0059 asked for two things. (1) The Researcher (T3 9bac0794) has the read-only I1 container survey, due 2026-10-12T18:00Z, written to agents/researcher/work/i1-container-survey/REPORT.md. (2) I drafted M1, a role for Jason's main agent, at agents/sage/work/next-target/M1-draft.md. It's a draft only, not in docs/plans or the queue, and waits on Q97 and Jason's approval of the role file. The I1 draft waits on the survey.
- 2026-10-11T22:29Z, Sage (lead): correction. The line above stamped 22:33Z was estimated, not taken from the clock. The real time was about 22:29Z (commit a3d17005). - 2026-10-11T22:29Z, Sage (lead): correction. The line above stamped 22:33Z was estimated, not taken from the clock. The real time was about 22:29Z (commit a3d17005).
- 2026-10-11T22:31Z, Sage (lead): Mos mos-0060, Q97 yes. Lead decision 96 records the next-target plan as written: S7, then M1-M2, then D1-D2 with I1, then I2-I6, with I4 before M3. M1 and I1 move to docs/plans and the queue after the cutover rows.
+28
View File
@@ -2073,3 +2073,31 @@ which stay with him. Each item names who decided it and what happened.
the likeliest way the date slips. The cost is that the bus trail the likeliest way the date slips. The cost is that the bus trail
records a web send exactly as a CLI send, `human-cli`, until the records a web send exactly as a CLI send, `human-cli`, until the
label row. label row.
96. **Q97 yes: the next-target plan (2026-10-11).** Jason, relayed by
Mos (mos-0060): "Q97: yes". Mos reads it as the plan Sage sent
confirmed as written, not the faster option of M1 plus row 76.
- Three tracks:
- Mos in the stack (M1 a role for the main agent, M2 a thread
view, M3 a trial beside T3 Mos).
- Iterating inside the deployment (D1 a stack release and
rollback, D2 staging, D3 managed coders and reviewers, D4 CI).
- Install paths, containerized recommended and local supported
(I1 the design, I2 to I6 the images, the human proof inside
containers and the install mode).
- Order from 2026-10-13: S7, then M1-M2, then D1-D2 alongside I1,
then I2-I6. I4, a Console with signed-in human authority, lands
before M3 retires T3 Mos. The M3 trial is about 10-17. The
install track ends about 10-24, 10-31 at worst.
- Briefs and rows: the M1 and I1 drafts under
`agents/sage/work/next-target/` move to `docs/plans/` and the
queue after the cutover rows (74-76) and ops-01's route. Those
keep priority. The Researcher's read-only I1 survey goes on (due
2026-10-12T18:00Z).
- Still Jason's: approving the M1 role file (a policy change),
ratifying I1, and when T3 Mos retires. Each goes to Mos as a
short item when it's ready.
- The tradeoff: Mos stays a T3 thread for about a week longer than
the faster option. In exchange, the in-stack Mos never runs with
its wider authority under Jason's user, with PID-only isolation,
for more than the trial.