docs(remediation): propagate DECISION-2 to charter — second un-propagated ruling, found by applying D-14

Applied D-14's own interim rule immediately instead of waiting to be bitten again, and
it caught a second instance within minutes: MISSION.md's standing directives still
stated the DB hard-cutover with no mention of Mos's binding qualification that the
spine must not be a single-point hard-stop (degraded mode + rollback artifact
required). A seat reading the charter would have designed toward an availability
posture the coordinator had explicitly rejected, with the superseded 'no DB means the
fleet stops' recommendation nowhere contradicted.

Two un-propagated rulings out of two that touched charter text. Without a mechanism,
propagation failure is the default outcome, not an oversight — which is the argument
for D-14 being a requirement rather than a discipline.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
This commit is contained in:
mos-dt-0
2026-07-31 18:12:16 -05:00
co-authored by Claude Opus 5
parent 7f686aaf6d
commit d0ad6e942b
2 changed files with 17 additions and 0 deletions
+5
View File
@@ -69,6 +69,11 @@ orphaned context loader, a fail-open bypass. **Work = wire + consolidate + retir
(WRAPPER), auto-sync sweep (WORKFLOW), #1018 stale-consumed (INBOX). The fleet is its own test bed.
- **Orchestration tracking → DB**, hard cutover ("rip off the bandaid"), NO flat-file interim. jarvis-brain
PDA flat-files untouched. Current flat-file tracking runs as-is/unhardened until DB tracking is real, then one clean replace.
-**QUALIFIED 2026-07-31 (DECISION-2, Mos):** the DB spine **must NOT be a single-point hard-stop.**
A broker-independent / degraded mode **and** a rehearsed rollback artifact are **design requirements**
(P-RECOVERY-001), binding now on RM-12, RM-13, RM-23, RM-36 and RM-53. This **supersedes** the earlier
orchestrator recommendation to pre-commit "no DB ⇒ the fleet stops" — that answer is _not_ on record.
Only the specific availability _target_ remains open, queued for Jason; it does **not** block current work.
## The 15 decisions (one-line; full rationale in the checkpoint)