# PRD 1.17 brief: Case 2 story files are DOCX
|
||||
|
||||
Sage, 2026-10-23, for mos-1366 item 1, mos-1467 and mos-1470. This follows
|
||||
`docs/plans/BRIEF-TEMPLATE.md`. Gitea #1815, Vikunja 570.
|
||||
|
||||
## PRD 1.17 Case 2 story files are DOCX (Q235 to Q237, Q239)
|
||||
|
||||
### Problem
|
||||
|
||||
Jason's Q235 to Q237 make Case 2 story files DOCX, with Markdown kept for notes
|
||||
and docs. PRD 1.16 still says every story file is Markdown in the user's
|
||||
repository, seen in Obsidian. The 1.17 text is approved: Jason approved d8 at
|
||||
435a7458d in Q239 with O2, which adds the Console Connections view (mark J-b).
|
||||
d9 carries that view in Mos's mos-1443 R3 text. Webby approved d9 in rounds 7
|
||||
and 8 (webby-0214, webby-0217), and Mos passed the J-b check in mos-1470.
|
||||
|
||||
The approved text is `agents/sage/work/prd-1-17/DRAFT-d9.md` at 4607e15b8, blob
|
||||
sha256 02f28decad7f946f. Its base is PRD 1.16, `docs/prd/mosaic-stack.md` blob
|
||||
a6db9b4a at 482e865ac (row 291).
|
||||
|
||||
### Owner and reviewer
|
||||
|
||||
- Owner: Gosalyn.
|
||||
- Reviewer: Webby.
|
||||
- After: row 291 (PRD 1.16).
|
||||
|
||||
### Files owned
|
||||
|
||||
The four files in DRAFT-d9.md's "Files the row would own", as it lists them:
|
||||
- `docs/prd/mosaic-stack.md`.
|
||||
- `packages/tasks/requirements.json`: version 1.17, the titles of REQ-LIB-1,
|
||||
REQ-LIB-2 and REQ-LIB-4, and the new ids REQ-LIB-8 and REQ-LIB-9 after
|
||||
REQ-LIB-7 and before REQ-INST-1.
|
||||
- `packages/tasks/tests/requirements.test.mjs`: the version pin 1.17, the count
|
||||
87 (:21), and the duplicate-id message `requirements[87].id: REQ-ROLE-1 twice`
|
||||
(:77).
|
||||
- `packages/bus/tests/requirements.test.mjs`: the list length 87 (:48).
|
||||
|
||||
### What ships
|
||||
|
||||
- Every "Replace", "Add, after", "becomes" and "New" instruction in DRAFT-d9.md's
|
||||
PRD sections, applied to the 1.16 text word for word. Each quoted old text
|
||||
occurs once in a6db9b4a, except "The Console shows each cite's scope.", which
|
||||
d9 scopes to REQ-LIB-2. Webby checked those counts in round 6.
|
||||
- The 1.17 header, Status line, source lines and notes as d9 writes them.
|
||||
- requirements.json as d9's requirements.json note says: REQ-LIB-1, REQ-LIB-2 and
|
||||
REQ-LIB-4 take the new titles, REQ-LIB-5 and REQ-LIB-6 keep theirs, and
|
||||
REQ-LIB-8 and REQ-LIB-9 are added with the titles d9 gives, so the count is 87.
|
||||
REQ-LIB-4's title is 117 characters, under the 120 limit in `requirements.mjs`
|
||||
(mos-1443 R2).
|
||||
- Nothing from d9's review sections goes into the PRD. That covers "Settled
|
||||
points", the "d2 changes" through "d9 changes" lists, "What d5 adds", "Marked
|
||||
for Jason" and the impact map notes.
|
||||
|
||||
### Out of scope
|
||||
|
||||
- The build rows for Vikunja 570 and 571, which Sage files after the landing.
|
||||
- The queue changes in the impact map (A24, A57 to A59), which go through
|
||||
`scripts/mosaic queue` (C9).
|
||||
- Gyro's design edit R3.4 at 767bb62c7.
|
||||
- Mos's build-order call (mos-1470): the Connections view lands before the first
|
||||
real chapter import opens. That belongs to Gyro's 571 rows, not the PRD.
|
||||
|
||||
### Gate
|
||||
|
||||
- Webby checks the candidate's PRD diff against DRAFT-d9.md, one instruction at a
|
||||
time, and checks that nothing else changed.
|
||||
- No new Jason question. Q239 approved the text, and a change beyond d9 would
|
||||
need a new version and his approval.
|
||||
- On Sage's gate:
|
||||
- tasks, run whole;
|
||||
- bus, run whole, because the broker loads requirements.json;
|
||||
- cli `stack-copy.test.mjs`;
|
||||
- every `scripts/test-*.sh`, under `timeout -k 10`.
|
||||
- Mos gets the landing commit (mos-1470).
|
||||
|
||||
### Handoffs
|
||||
|
||||
Every seat hands off directly (DECISIONS Q210, mos-1221). When the owner pushes a
|
||||
round or the reviewer posts a verdict, that seat messages the next seat's T3
|
||||
thread and Sage's with `mcp__t3__t3_send_message`. Mos has one step here, which
|
||||
is receiving the landing commit.
|
||||