plans: PRD 1.17 brief (Gitea #1815, Vikunja 570): Gosalyn builds d9 4607e15b8 onto 1.16 after row 291, Webby reviews, four files, Sage gates

This commit is contained in:
jason.woltje committed 2026-10-23 10:44:58 -05:00
1 parent 4607e15b83
commit e909ef51a2
1 file changed
+82
+82
View File
@@ -0,0 +1,82 @@
# PRD 1.17 brief: Case 2 story files are DOCX
Sage, 2026-10-23, for mos-1366 item 1, mos-1467 and mos-1470. This follows
`docs/plans/BRIEF-TEMPLATE.md`. Gitea #1815, Vikunja 570.
## PRD 1.17 Case 2 story files are DOCX (Q235 to Q237, Q239)
### Problem
Jason's Q235 to Q237 make Case 2 story files DOCX, with Markdown kept for notes
and docs. PRD 1.16 still says every story file is Markdown in the user's
repository, seen in Obsidian. The 1.17 text is approved: Jason approved d8 at
435a7458d in Q239 with O2, which adds the Console Connections view (mark J-b).
d9 carries that view in Mos's mos-1443 R3 text. Webby approved d9 in rounds 7
and 8 (webby-0214, webby-0217), and Mos passed the J-b check in mos-1470.
The approved text is `agents/sage/work/prd-1-17/DRAFT-d9.md` at 4607e15b8, blob
sha256 02f28decad7f946f. Its base is PRD 1.16, `docs/prd/mosaic-stack.md` blob
a6db9b4a at 482e865ac (row 291).
### Owner and reviewer
- Owner: Gosalyn.
- Reviewer: Webby.
- After: row 291 (PRD 1.16).
### Files owned
The four files in DRAFT-d9.md's "Files the row would own", as it lists them:
- `docs/prd/mosaic-stack.md`.
- `packages/tasks/requirements.json`: version 1.17, the titles of REQ-LIB-1,
REQ-LIB-2 and REQ-LIB-4, and the new ids REQ-LIB-8 and REQ-LIB-9 after
REQ-LIB-7 and before REQ-INST-1.
- `packages/tasks/tests/requirements.test.mjs`: the version pin 1.17, the count
87 (:21), and the duplicate-id message `requirements[87].id: REQ-ROLE-1 twice`
(:77).
- `packages/bus/tests/requirements.test.mjs`: the list length 87 (:48).
### What ships
- Every "Replace", "Add, after", "becomes" and "New" instruction in DRAFT-d9.md's
PRD sections, applied to the 1.16 text word for word. Each quoted old text
occurs once in a6db9b4a, except "The Console shows each cite's scope.", which
d9 scopes to REQ-LIB-2. Webby checked those counts in round 6.
- The 1.17 header, Status line, source lines and notes as d9 writes them.
- requirements.json as d9's requirements.json note says: REQ-LIB-1, REQ-LIB-2 and
REQ-LIB-4 take the new titles, REQ-LIB-5 and REQ-LIB-6 keep theirs, and
REQ-LIB-8 and REQ-LIB-9 are added with the titles d9 gives, so the count is 87.
REQ-LIB-4's title is 117 characters, under the 120 limit in `requirements.mjs`
(mos-1443 R2).
- Nothing from d9's review sections goes into the PRD. That covers "Settled
points", the "d2 changes" through "d9 changes" lists, "What d5 adds", "Marked
for Jason" and the impact map notes.
### Out of scope
- The build rows for Vikunja 570 and 571, which Sage files after the landing.
- The queue changes in the impact map (A24, A57 to A59), which go through
`scripts/mosaic queue` (C9).
- Gyro's design edit R3.4 at 767bb62c7.
- Mos's build-order call (mos-1470): the Connections view lands before the first
real chapter import opens. That belongs to Gyro's 571 rows, not the PRD.
### Gate
- Webby checks the candidate's PRD diff against DRAFT-d9.md, one instruction at a
time, and checks that nothing else changed.
- No new Jason question. Q239 approved the text, and a change beyond d9 would
need a new version and his approval.
- On Sage's gate:
- tasks, run whole;
- bus, run whole, because the broker loads requirements.json;
- cli `stack-copy.test.mjs`;
- every `scripts/test-*.sh`, under `timeout -k 10`.
- Mos gets the landing commit (mos-1470).
### Handoffs
Every seat hands off directly (DECISIONS Q210, mos-1221). When the owner pushes a
round or the reviewer posts a verdict, that seat messages the next seat's T3
thread and Sage's with `mcp__t3__t3_send_message`. Mos has one step here, which
is receiving the landing commit.