jason.woltje a8d9eecf65 organization: move packages/business to packages/organization (rename r2 stage B1)
git mv packages/business -> packages/organization (@mosaic/organization). The
old package stays as one-line re-export shims of each moved module, with
src/business.mjs re-exporting src/organization-config.mjs and src/cli.mjs
forwarding to the moved executable. BusinessError is OrganizationConfigError
(one constructor, name kept BusinessError); OrganizationError stays distinct.
The bus adapter gains organization-context.mjs (busOrganization), with
business.mjs (busBusiness) as the same function.

Import consumers, manifests, the lockfile, scripts/mosaic, stack-copy.sh
COPY_PATHS (both roots), seat sandbox RUNNER_FILES and the copy closure
walker (organization-imports.mjs, both roots required) move to the new path.
v1 serialization, v1 writers and the stage A fixtures are unchanged; the stage
A contract tests stay where they were and pass as before.
2026-11-09 11:47:48 -06:00
jason.woltje 1c33c342bc fix(archive): fence new execution and preserve archived reads (#797) 2026-11-06 01:51:08 -06:00
jason.woltje ea0e885bc9 fix(bus): keep foreign working repos refused, hold the organization lock through protected commits, fence serving on the activate receipt (#802) 2026-11-04 10:38:54 -06:00
jason.woltje 7f5bbbf747 fix(bus): confine the working repo, serialize freshness with protected writes, fence readiness on publication (#802) 2026-11-04 10:38:54 -06:00
jason.woltje 8830030412 fix(bus): confine bootstrap writes, keep unproven partials, recheck freshness per effect, wire host preparation (#1839) 2026-11-03 20:41:46 -06:00
jason.woltje c558498062 feat(bus): bootstrap a confirmed new project and admit it at runtime (#1839)
Lifecycle Task 2 (#797). A confirmed new-project selection now becomes a
usable product: the code checkout, the organization mapping, the records
repository with the original intent as the owner's spec commit, the chat
association and the working repository, each journaled as its own receipt
(bootstrap:<plan_digest>:<step>) and recoverable after a kill.

- business: addProject is a private exact-add writer under the existing
  organization lock and receipt discipline; hold runs a synchronous check
  under that lock; findAddition recovers a prepared receipt. Ordinary
  writers still refuse every project change.
- bus: prepareBootstrap and executeBootstrap; activateManagedProject
  reloads only a receipt-backed additive root and admits it to the broker
  after readiness; request.admission host IPC op for the launcher.
- #800: the bound organization revision and association are re-verified
  inside the organization lock at the start of execution; a mismatch
  records request-plan-stale and performs no effect.
- cli: trackerFor skips reserved products; the launcher refuses to clone a
  product the bus has not admitted.
- seat: initializeWorking seeds the working repository, host-only, with no
  work ref or push authority.
- schema: append-only migration 3o to 3p widens the request_events kind
  list with bootstrap.stale and bootstrap.completed.
2026-11-03 19:50:32 -06:00