Commit Graph
10 Commits
Author SHA1 Message Date
mos-dt-0andClaude Opus 5 357a636a3a docs(remediation): promote redundant-observation to charter; bank D-35 (tool caught what attention could not)
Charter gains a fifth principle from D-33: two observers of the same evidence,
disagreeing, catch what neither catches alone — applied to evidence GATHERING, not just
judgement. A summary that resembles an enumeration is more dangerous than one that
obviously summarises; prefer the machine-readable record and state counts so divergence
is detectable.

D-35: while editing merge-gate.md to fix D-33, the coordinator recalled the mandate
string instead of reading it and the Edit tool's exact-match REJECTED it. Third instance
for that author, inside the turn fixing another instance of the same class — and the
only one that did not reach a document, because a mechanism caught it.

A rule that fails in its authors but is caught by a tool has told you where it belongs.
RM-02 should enforce verbatim citation by construction, as the Edit tool did by accident
of design.

Fix landed by annotating the source: merge-gate.md mandates 3 and 4 now require the
scan and count from the JSON record. The shared wrapper was deliberately NOT modified
mid-flight — three lanes are reading it; fix at a seam.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-08-01 00:53:27 -05:00
mos-dt-0andClaude Opus 5 cdd5568adb docs(remediation): promote query-for-refutation to charter doctrine
Per Mos. A subordinate asked to confirm a hypothesis will agree — the bias is induced by
the query, not by the answerer's diligence. 'The DB flaked, please confirm' and 'confirm
or refute, with the log line that proves it' are different instruments returning
different answers to the same question.

This matters most with agent subordinates, which are agreeable by construction, so the
discipline cannot rest on the answerer being rigorous — it must be built into how the
question is asked.

Origin: the orchestrator's ci-postgres hypothesis was refuted by the implementing seat
with log evidence and then settled by reproduction. Phrased for confirmation, it would
have returned agreement and D-21 would have been re-classified on a false premise,
silently corrupting a banked finding.

Operational form: state the hypothesis as yours, ask for evidence that kills it, say
what would change your mind, and reproduce when the answer is consequential. Added to
KICKSTART's standing invariants so it survives compaction.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 23:21:15 -05:00
mos-dt-0andClaude Opus 5 cbbe3e1ce2 docs(remediation): gate definition now REFERENCES canonical roles; bank D-26
The delivery-gate definition was incomplete from setup — the merge-gate verdict step
was missing because the gates were restated from memory rather than referenced, and the
omission propagated into every worker brief since.

Then it recurred inside the correction: the correcting message was itself a restatement
and dropped five things, including a security precondition (an unminted gate seat fails
open to the owner's admin account — the #3084 breach mechanism) and a citation to a file
that does not exist.

D-26 is the definitive case because every condition favoured success: attention maximal,
actor knew the rule best, subject was the rule itself. A rule its own enforcer cannot
follow while enforcing it is not a discipline — it is a requirement for a mechanism.

MISSION.md and KICKSTART.md now reference fleet/roles.local/merge-gate.md and
fleet/roles/validator.md and state only the gate ORDER. Every reference resolves; a
dangling pointer is worse than a restatement.

Precondition independently verified: merge-gate token is least-privilege,
pull=True push=False admin=False — structurally cannot merge.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 22:53:13 -05:00
mos-dt-0andClaude Opus 5 9a7ab73952 docs(remediation): charter — Builds 1-2 justified by two independent impossibility proofs; RM-60 option analysis
Per Mos. The choke-point executor and PG spine are not a design preference — they are
forced. Twice during the mission's own first deliveries, work stopped against a security
property that cannot exist at the layer needing it: D-19 (audited party controls the
manifest certifying it — artifact integrity) and D-25 (audited party controls the code
entering the sandbox — execution integrity). Both reduce to self-verification by the
audited party is not verification, and both resolve only via an authority outside its
control.

Neither proof was sought; both arrived while shipping something else, from different
directions, at different layers. An architecture forced by two independent impossibility
proofs is stronger evidence than one argued for.

RM-60 records Mos's sharper option analysis: A (unprivileged userns) does NOT fix the
vulnerability — it grants a capability and leaves the ORDERING defect untouched, so B is
required regardless; A without B is kernel exposure bought for nothing. B is the correct
primitive, generalises to RM-59 and the choke-point executor, and may not need A at all.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 22:09:38 -05:00
mos-dt-0andClaude Opus 5 43f69bf167 docs(remediation): promote D-19 to charter; bind residual risk to RM-59 as a tracked edge
Per Mos, with his two additions.

Charter gains a fourth first-class principle: when a property cannot exist at the layer
that specified it, three honest moves are mandatory — implement what the layer can
guarantee; state the boundary in BOTH directions (what it does not defend AND what it
does, since either alone misleads); and record the real guarantee as a TRACKED
DEPENDENCY, not prose. A written-down gap is acceptable engineering; an implied-fixed
gap is the mission's core failure in a new costume.

The residual risk is now RM-59 (depends_on RM-12, RM-21, RM-25) — a real backlog task
owned by the choke-point executor and spine, which verify from outside the worktree's
authority. Mos's point: 'record where the guarantee comes from' only holds if the record
is a live dependency someone must close; a documented gap with no owner becomes a
permanent gap that reads as intentional.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 19:23:15 -05:00
mos-dt-0andClaude Opus 5 3b191b6b34 docs(remediation): promote the three-mode taxonomy and the integrity-claim corollary to the charter
Per Mos. Two first-class principles alongside observe-the-property:

1. Pre-registration prevents RETROFITTING and nothing else. A pre-registered check set
   can be WRONG (D-8), INCOMPLETE (D-17), or INTERNALLY INCONSISTENT (D-18). It confers
   neither correctness nor coverage nor consistency. All three modes were found on this
   mission's own first delivery, by the machinery applied to its own work. RM-02's four
   clauses are the enforceable form.

2. Never ship an integrity claim dressed as a property. A verification artifact
   writable by the actor whose behaviour it certifies certifies the attack. It must sit
   inside its integrity envelope, publish atomically, and carry a tamper negative
   control observed red. If it cannot be made tamper-evident, say so and reconsider —
   an honest 'this cannot be verified' is always available and always preferable to
   laundering foreign content as certified.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 19:14:06 -05:00
mos-dt-0andClaude Opus 5 d0ad6e942b docs(remediation): propagate DECISION-2 to charter — second un-propagated ruling, found by applying D-14
Applied D-14's own interim rule immediately instead of waiting to be bitten again, and
it caught a second instance within minutes: MISSION.md's standing directives still
stated the DB hard-cutover with no mention of Mos's binding qualification that the
spine must not be a single-point hard-stop (degraded mode + rollback artifact
required). A seat reading the charter would have designed toward an availability
posture the coordinator had explicitly rejected, with the superseded 'no DB means the
fleet stops' recommendation nowhere contradicted.

Two un-propagated rulings out of two that touched charter text. Without a mechanism,
propagation failure is the default outcome, not an oversight — which is the argument
for D-14 being a requirement rather than a discipline.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 18:12:16 -05:00
mos-dt-0andClaude Opus 5 f13222b76b docs(remediation): charter reflects DECISION-1 corrected wire-in target and current status
The charter's build-1 cell still named mosaic_orchestrator.py::run_single_task after
DECISION-1 ruled against it. Leaving the charter contradicting the ruled decision would
mislead any future reader who starts there — corrected in place with the rationale and
provenance, rather than only in TASKS.md.

Also: status PLANNING -> EXECUTING; scout TODO discharged (file is in-tree) with a note
that its findings stand but its recommended wire-in point is superseded.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 18:07:16 -05:00
mos-dt-0andClaude Opus 5 d1e7ba19ca docs(remediation): promote observe-the-property principle to charter; bank D-13 dual credential registries
Charter gains a first-class principle per Mos: no write is done until the requested
PROPERTY is observed; a success exit code is not evidence. Success output is designed
to be believed — that is why the inert-gate class exists and why the P-WRAPPER
tri-state is not optional. Recorded with its provenance: the orchestrator committed
this exact error (D-12), and three of the session's twelve instances were its own.

D-13: diagnosing D-12 found two parallel credential registries that can disagree.
gitea-mosaicstack-mos-dt-0.token EXISTS, but tea has no mosaicstack login for that
identity — so raw-API paths work while tea-dependent wrapper paths silently degrade.
tea is not stale; the login does not exist. Capability declared authoritative by the
token-file set does not govern the tea path.

RM-04 must reconcile the registries (or assert agreement at startup, with a must-fail
control). RM-50's pre-dispatch check must verify capability for the path actually used.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 18:06:18 -05:00
mos-dt-0andMos 01e966f36d docs(remediation): mission charter + reconciled execution backlog (#1026)
ci/woodpecker/push/publish Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: mos-dt-0 <[email protected]>
2026-07-31 22:47:03 +00:00