Commit Graph
2 Commits
Author SHA1 Message Date
marcie 8beb907de4 framework tools/git: pr-merge --base-line — documented intra-line exception (B5, ruled + orch-01 adopted)
ci/woodpecker/pr/ci Pipeline was successful
A merge whose base is neither main nor next now has an explicit,
gated path instead of forcing coordinator raw-API: --base-line <branch>
must MATCH the PR base (mismatch refuses naming both), the audit line
records the authorization, and queue guard / head pin / CI gates are
unchanged and still enforced (the suite proves the guard still runs
under the exception, stub rc propagates). Enrolled suite (3 arms).
Refusals stay exit 1: pr-merge's usage-class distinction remains
design-first work per the census (#1464 exclusions).
2026-08-29 11:27:31 -05:00
marcieandorch-01 41e8046371 framework tools/git: issue-comment R1/R4 usage-error contract (sync from brain) (#1462)
ci/woodpecker/push/publish Pipeline failed
Co-authored-by: marcie <[email protected]>
2026-08-29 01:58:42 +00:00