Compare commits

..
2 changed files with 17 additions and 1 deletions
+16 -1
View File
@@ -77,4 +77,19 @@ from overlapping, so the first pass finds at most one.
## Runs
None yet. Every run waits for Sage's CLEAR.
- r2 ecd9b35eb on dcd8d4dda, Sage's CLEAR sage-2449, one pass with the first red stopping it
(run-268-c.sh), 2026-10-22 04:40:22Z to 04:42:17Z, 115 s. M1, M2 and M3 all killed (scope.test
2 of 3 failed, mapping.test 2 of 11, mapping.test 1 of 11), and each file's sha256 matched after the restore.
Brief files 14/14, library 83/83, business 209/209. test-auth 15, test-conductor 17, test-config
31, test-discord 78, test-extension-package 18, test-foundation 44, test-land-work 86, test-queue
28 plus 156 node, test-release 14, test-task 91, with 0 failures. Node skipped 0. The scripts
skipped three cases: test-queue's verify and render check (not the canonical root) and
test-task's live provider cases twice (row 244). Neither test-task skip is a dead-Docker skip.
- r3 aca53c4f0 on 0fa7bf421, after row 191 landed. The cherry-pick of r2 has range-diff `=` and
stable patch-id 2942acc8e6e2b0171b96ebbf033ab5c08c0f0eac. Rerun on CLEAR sage-2461, 04:50:29Z to
04:50:38Z: brief files 14/14, library 83/83 (survey.test on 191's scripts/mosaic), business
209/209, 0 skipped. Webby approved r3 as a carry (webby-0112).
- r4 c27207f6e on ce6a96ad6, after row 205 landed (sage-2466: 205's gate went first). Cherry-pick
of r3 with range-diff `=` and the same patch-id. Rerun on CLEAR sage-2480, 05:04:50Z to
05:04:58Z: brief files 14/14, library 83/83, business 209/209, 0 skipped.
- Every sweep found the worktree clean and no node process in it or in its temp dir.
+1
View File
@@ -1525,3 +1525,4 @@ are never rewritten or removed; corrections are new entries.
2026-10-22 11:32 UTC | Sage (Opus 5.5, 1ef1e4f8) | Vikunja 502 landing; 281 and 264a slot reds placed | V502 LANDED 6af85df4b (ff from 980cec88c, Dewey carry dewey-0836). Row 281 c174f37ac and 264a r7 a23afbf95 each went red on first-run test defects. 281 b3 is test-only (T6b ruling accepted by Dewey 0837). 264a r8 pins the 3l seq-0 rows. Megavolt reruns 281 on 6af85df4b.
2026-10-22 13:10 UTC | Sage (Opus 5.5, 1ef1e4f8) | Rows 278 and 281 landings; slot order 281 then 264a r10 then 253 | 278 LANDED 385a7194c (Webby c30588), 281 LANDED e479521d3 (Dewey c30614). DEFERRED: grant gap closed, N1/N2 open. 264a rebasing to r10 on e479521d3; 253 waits on 264a.
2026-10-22 14:22 UTC | Sage (Opus 5.5, 1ef1e4f8) | Row 264a landing; doc sweep | 264a LANDED 84f53540d (Duckworth c30640, #1769 closed c30646, P19 463 c669) after four slot reds ruled in mos-1276 to mos-1279. Doc sweep: V502, 278/281 and 264a BUILD-LOG lines, DEFERRED 281 N1/N2 and 264a N1/N2. 253 rebases onto the landing next.
2026-10-22T14:26Z | Gizmoduck (Opus 5.5, 9312a896) | rows 264a (#1769) and 268 (#1773) after-landing docs; row 269 plan | 264a LANDED 84f53540d after r13 and r13p4 (mos-1279). Runs doc f7e4ec3df landed (mos-1280 item 1). Row 268 Runs doc 2428c4225 on gizmoduck/row268-runs-b for Sage. Row 216 may resume (268 landed c27207f6e). Row 269 (264b, #1774) plan sent as gizmoduck-0228, not claimed. r10-r13 worktrees removed, branches kept.