docs(l0): parameterize hard gates on the project's integration trunk (#1216, Option A) #1217

Open
mos-dt-0 wants to merge 1 commits from docs/1216-trunk-parameterization into next
1 Commits
Author SHA1 Message Date
Jason WoltjeandClaude Fable 5 18f960d3e1 docs(l0): parameterize hard gates on the project's integration trunk
ci/woodpecker/pr/ci Pipeline was successful
Per Jason's Option-A ruling on #1216: the constitution supplies the general
framework; the project declares its own flow. Defines the integration trunk
once in CONSTITUTION.md Hard Gates — declared by exactly one
'Integration trunk: <branch>' line in the project's root AGENTS.md, default
'main', value bound by git check-ref-format --branch semantics, malformed or
multiple declarations are a hard stop, one trunk only, no gate relaxation —
and binds gates 5/15, E2E-DELIVERY, CODE-REVIEW, ORCHESTRATOR(-PROTOCOL),
BOOTSTRAP provisioning, and the defaults AGENTS session closure to that term.
CI-CD-PIPELINES YAML examples stay on the default trunk with a substitution
note.

Known mechanized consumer left as tracked follow-up on #1216: pr-merge.sh:133
hardcodes a {main,next} base allowlist — fail-closed (refuses exotic trunks,
cannot misroute), to be parameterized with red-first tests separately.

Refs #1216

Co-Authored-By: Claude Fable 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01WYgWocp36goy8hj2ui6ps1
2026-08-13 13:45:49 -05:00