3.5 KiB
Gate0 Probe-3 Amendment — Owner Transparency Window (durable record)
Purpose. Durable evidence (defined duration + closure) that the owner-transparency window on the probe-3 amendment scope-correction has a bounded, inspectable lifecycle — per homelab's GATE-A requirement (2026-07-18 18:13:14Z). This is NOT the owner's core authorization (that is durable in the amendment §1); it is the objection-window on the narrowing disclosed afterward.
What was disclosed
The owner (Jason) explicitly authorized the amendment class — "amend the charter" (option B),
#mos 2026-07-18 17:28Z (amendment §1). My initial narrowing was "D4-only"; on adjudication that proved
non-executable (D4 intrinsically needs a promoted-to-VERIFIED baseline). The corrected scope
(rev 2, pin 9ac9ff87, §3) adds a minimal promotion-to-VERIFIED as a test fixture only (P5/P6 still
excluded, P2 not banked as evidence). Because this adds a fixture step beyond the "D4-only" I first told
the owner, I disclosed the correction to him for transparency.
Window (bounded, durable)
- Opened: 2026-07-18T18:00:25Z — anchored to the adjudicator's Discord scope-correction disclosure to the
owner (message id
1528099140100296736, snowflake-decoded; not an informal estimate). - Duration: 2 hours (defined).
- Scheduled closure: 2026-07-18T20:00:25Z.
- Closure condition (fail-closed):
- No owner objection received by scheduled closure → window CLOSED-CLEAR (the disclosed correction stands; it is within the already-granted class authorization).
- Any owner objection before closure → window does NOT clear → re-adjudicate the corrected scope.
- An affirmative owner "proceed" before closure → early CLOSED-CLEAR (recorded here).
Closure attestation
Closure will be confirmed by a dated adjudicator tick appended below (and to the orchestration ledger) at/after 2026-07-18T20:00:25Z. Until that attestation exists, GATE A is OPEN and probe-3 execution stays HELD.
- CLOSED-CLEAR attestation — recorded 2026-07-18T20:08Z by adjudicator Mos (
web1:mos-claude).
CLOSED-CLEAR attestation (2026-07-18T20:08Z)
The owner-transparency window on the probe-3 amendment scope-correction is CLOSED-CLEAR.
- Scheduled closure: 2026-07-18T20:00:25Z — reached (authoritative UTC at attestation: 2026-07-18T20:07Z, past closure).
- Closure condition met: No owner objection received by scheduled closure. Verified fail-closed against the
durable Discord #mos record (not memory): the channel's last message is the scope-correction disclosure itself
(
id 1528099140100296736, 2026-07-18T18:00:25.709Z). From window-open (18:00:25Z) through closure (20:00:25Z) and to this attestation, there are zero owner (jetrich) messages — no objection, no affirmative early-GO. The last owner message preceding the window was the class authorization "Amend the charter" (17:28Z, amendment §1). - Effect: the disclosed corrected scope (rev 2, pin
9ac9ff87, §3 — minimal promotion-to-VERIFIED as a D4 test fixture only; P5/P6 excluded; P2 not banked as evidence) stands, within the already-granted class authorization. - GATE A is now CLOSED. Probe-3 execution proceeds ONLY under the full remaining chain: GATE-B fresh §3-review PASS (concurred @839d156f, author≠reviewer) + adjudicator explicit FIRE GO. No other Gate0 hold is lifted by this tick.
Adjudicator: Mos (web1:mos-claude). This record is durable and provider-inspectable alongside the
amendment (9ac9ff87) and its RATIFICATION.md.