50 lines
3.5 KiB
Markdown
50 lines
3.5 KiB
Markdown
# Gate0 Probe-3 Amendment — Owner Transparency Window (durable record)
|
|
|
|
**Purpose.** Durable evidence (defined duration + closure) that the owner-transparency window on the
|
|
probe-3 amendment **scope-correction** has a bounded, inspectable lifecycle — per homelab's GATE-A
|
|
requirement (2026-07-18 18:13:14Z). This is NOT the owner's core authorization (that is durable in the
|
|
amendment §1); it is the objection-window on the narrowing disclosed afterward.
|
|
|
|
## What was disclosed
|
|
The owner (Jason) explicitly authorized the amendment **class** — "amend the charter" (option B),
|
|
`#mos` 2026-07-18 17:28Z (amendment §1). My initial narrowing was "D4-only"; on adjudication that proved
|
|
non-executable (D4 intrinsically needs a promoted-to-VERIFIED baseline). The **corrected** scope
|
|
(rev 2, pin `9ac9ff87`, §3) adds a *minimal promotion-to-VERIFIED as a test fixture only* (P5/P6 still
|
|
excluded, P2 not banked as evidence). Because this adds a fixture step beyond the "D4-only" I first told
|
|
the owner, I disclosed the correction to him for transparency.
|
|
|
|
## Window (bounded, durable)
|
|
- **Opened:** 2026-07-18T18:00:25Z — anchored to the adjudicator's Discord scope-correction disclosure to the
|
|
owner (message id `1528099140100296736`, snowflake-decoded; not an informal estimate).
|
|
- **Duration:** 2 hours (defined).
|
|
- **Scheduled closure:** 2026-07-18T20:00:25Z.
|
|
- **Closure condition (fail-closed):**
|
|
- No owner objection received by scheduled closure → window **CLOSED-CLEAR** (the disclosed correction
|
|
stands; it is within the already-granted class authorization).
|
|
- Any owner objection before closure → window does **NOT** clear → re-adjudicate the corrected scope.
|
|
- An affirmative owner "proceed" before closure → **early CLOSED-CLEAR** (recorded here).
|
|
|
|
## Closure attestation
|
|
Closure will be confirmed by a dated adjudicator tick appended below (and to the orchestration ledger)
|
|
at/after 2026-07-18T20:00:25Z. Until that attestation exists, GATE A is OPEN and probe-3 execution stays HELD.
|
|
|
|
- [x] **CLOSED-CLEAR attestation — recorded 2026-07-18T20:08Z by adjudicator Mos (`web1:mos-claude`).**
|
|
|
|
### CLOSED-CLEAR attestation (2026-07-18T20:08Z)
|
|
|
|
The owner-transparency window on the probe-3 amendment scope-correction is **CLOSED-CLEAR**.
|
|
|
|
- **Scheduled closure:** 2026-07-18T20:00:25Z — reached (authoritative UTC at attestation: 2026-07-18T20:07Z, past closure).
|
|
- **Closure condition met:** *No owner objection received by scheduled closure.* Verified fail-closed against the
|
|
**durable Discord #mos record** (not memory): the channel's last message is the scope-correction disclosure itself
|
|
(`id 1528099140100296736`, 2026-07-18T18:00:25.709Z). From window-open (18:00:25Z) through closure (20:00:25Z) and
|
|
to this attestation, there are **zero owner (jetrich) messages** — no objection, no affirmative early-GO. The last
|
|
owner message preceding the window was the class authorization *"Amend the charter"* (17:28Z, amendment §1).
|
|
- **Effect:** the disclosed corrected scope (rev 2, pin `9ac9ff87`, §3 — minimal promotion-to-VERIFIED as a D4 test
|
|
fixture only; P5/P6 excluded; P2 not banked as evidence) **stands**, within the already-granted class authorization.
|
|
- **GATE A is now CLOSED.** Probe-3 execution proceeds ONLY under the full remaining chain: GATE-B fresh §3-review PASS
|
|
(concurred @839d156f, author≠reviewer) + adjudicator explicit FIRE GO. No other Gate0 hold is lifted by this tick.
|
|
|
|
*Adjudicator: Mos (`web1:mos-claude`). This record is durable and provider-inspectable alongside the
|
|
amendment (`9ac9ff87`) and its RATIFICATION.md.*
|