D-1 RULED — corrected wire-in target is a new production Node TaskExecutor on the
LIVE dispatch path (packages/mosaic launch + packages/coord) that Coord/Forge/live
dispatch submit through. The Python rail is deleted, not ported. RM-21/26/27/52 updated.
D-2 — Jason-pending and explicitly NON-blocking. Binding meanwhile: the DB spine must
not be a single-point hard-stop; degraded mode + rollback artifact become design
requirements on RM-12/13/23/36/53. This reverses the earlier recommendation to
pre-commit 'no DB means the fleet stops'.
D-3 — RM-03 HOLD; PR #1023 marked SUPERSEDED-PENDING-JASON; RM-02/RM-55 proceed
independently since conformance assertion is not the gate-6 fix itself.
RM-03 now carries BOTH queue-guard defects: wrong exit on unknown, and evaluating
branch=main rather than the branch being pushed.
D-7 — shared 30G /tmp hit 100% ENOSPC, degrading two seats. ~5.2G of it is session
scratch dead for 8-9 days; this session's own footprint is 88K. Same missing
capability as P-FLEET-001 stale-session GC, applied to disk. Folded into RM-50, and
RM-01 gains artifacts-off-shared-tmp acceptance criteria.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>