Files
stack/docs/plans/CURRENT.md
T

1.2 KiB
Raw Blame History

CURRENT — single source of "what happens next"

This file always names exactly one next action. Any "continue" / "next" / "proceed" message means: execute the action below, fully (implement → test → verify against its acceptance criteria → commit → push → close the issue → update this file to the next action). No ambiguity, no re-planning.

Next action

Gitea issue: (none queued — awaiting owner direction)

Queue (ordered, not started)

  1. Owner review of M5M7 (workspaces, capabilities, sessions) — hands-on
  2. M8 candidate: mission-level capability policy (defaults per mission)
  3. M9 candidate: run-record retention + retry <runId> convenience

Rules

  • One action in flight. Update this file at the END of every action.
  • Blocked? Move the item to "Blocked" below with the reason and stop.
  • Completed actions move to the log at the bottom (date + issue + result).

Blocked

(none)

Completed log

  • 2026-09-03 — M5 workspaces + capability envelope (#20, #21) — merged, tests green
  • 2026-09-03 — M6 named sessions + resume (#22, #23) — merged, teach/recall verified
  • 2026-09-03 — M7 run inspection + release 0.0.6 (#24) — merged, activated