mos-dt-0andClaude Opus 5 2b85afe4ea docs(remediation): bank D-25, accept RM02-REQ-10 revision, open RM-60
RM-02's per-commit replay needs isolation; the privileged CI step was correctly refused
because PR-controlled code executes before Bubblewrap establishes any boundary — the
untrusted party would obtain the capability meant to contain it. Ordering defect, not a
hardening problem.

D-25 is D-19 one layer down: audited party controls the manifest (artifact integrity)
became audited party controls the code entering the sandbox (execution integrity). Both
reduce to self-verification by the audited party is not verification, and both resolve
via an authority outside its control — twice now this mission has derived Builds 1-2
from a security impossibility rather than design preference.

Option C ruled independently by the orchestrator and rev-974 before either saw the
other. rev-974 added the condition I missed and it matters most: post-merge replay is
DETECTION, not PREVENTION, with a defined quarantine/revert response, and must never be
presented as equivalent to a pre-merge gate.

RM02-REQ-10 revision formally recorded and accepted under RM-02's own clause 4 —
original text, restatement, reason — discharging rev-974's review-readiness condition.
RM-60 opened for the external pre-execution trust boundary, cross-referenced with RM-59.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-07-31 22:05:50 -05:00
..