Files
stack/docs
jason.woltje 3e53af3941 fix(bus,webui): pd review round, supersede after apply, one pack hire loop per org, hireError, fromPack (#1873, lane pd)
Review pd-review.md (changes 6). Fixed:
- P2#2: the owner's pack hire withdraws a pack-raised inbox decision only
  after its replacement hire applied; a replacement that refuses (route
  missing, prepare refusal) leaves the old decision open in the inbox.
- P3#3: an apply whose hire loop throws after the apply committed still
  answers the apply receipt, with no hires and the code as hireError; the
  route passes a code through and the card says the hires did not run.
- P3#5: the packs read marks an awaiting-owner line this pack's own hire
  raised fromPack: true; the owner's card counts it in "Hire the N".
- P3#6: one pack hire loop per business; a second refuses
  organization-busy and raises nothing.
- P2#1 docs: TOOLS.md and the bus README say no member surface calls
  pack.hire.console yet (the member surface is a recorded follow-up).

Deferred: P3#4 project agents naming their pack (projectUnion is shared
with the runtime).
2026-11-14 16:09:46 -06:00
..
2026-09-03 16:34:20 -05:00