Files
stack/docs/plans/CURRENT.md
T

37 lines
1.8 KiB
Markdown

# CURRENT — single source of "what happens next"
This file always names exactly one next action. Any "continue" / "next" /
"proceed" message means: execute the action below, fully (implement → test →
verify against its acceptance criteria → commit → push → close the issue →
update this file to the next action). No ambiguity, no re-planning.
## Next action
Owner decision on M9: mission-level capability policy (design sketch: missions may declare default tool sets; tasks inherit unless overridden; conductor validates the merge). Say "next" to proceed or name a different target.
## Queue (ordered, not started)
1. M9: mission-level capability policy
2. Run-record retention/pruning policy
3. Second real adapter (parked — owner focused on Pi)
4. Auto-apply policy for worker patches (deferred until capability policy exists)
## Rules
- One action in flight. Update this file at the END of every action.
- Blocked? Move the item to "Blocked" below with the reason and stop.
- Completed actions move to the log at the bottom (date + issue + result).
## Blocked
(none)
## Completed log
- 2026-09-03 — M5 workspaces + capability envelope (#20, #21) — merged, tests green
- 2026-09-03 — M6 named sessions + resume (#22, #23) — merged, teach/recall verified
- 2026-09-03 — M7 run inspection + release 0.0.6 (#24) — merged, activated
- 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified
- 2026-09-03 — retry lineage + relative mission resolution (#28) — merged, 36/24/14 suites + verify green
- 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified