ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
21 lines
817 B
Markdown
21 lines
817 B
Markdown
---
|
|
kind: guide
|
|
status: active
|
|
---
|
|
|
|
# Architecture Decisions
|
|
|
|
> **Status:** Current decision index. A decision describes an implemented and accepted boundary; draft proposals belong under `rfcs/` or `docs/plans/`.
|
|
|
|
## Current decisions
|
|
|
|
- [Mos runtime portability M1 — logical identity and fencing](mos-runtime-portability-m1.md) — implemented lease, grant, audit, policy, and fencing boundary; connector activation remains held.
|
|
|
|
Decision pages do not override product requirements, API contracts, or executable behavior. Each page must identify implementation evidence, operational status, and explicit non-goals.
|
|
|
|
## Related
|
|
|
|
- [[DEVELOPER-GUIDE/architecture/README|Architecture index]]
|
|
- [[PRD|Product requirements]]
|
|
- [[ADMIN-GUIDE/operations/mos-connector-lease-operations|Held connector lease operations]]
|