docs(remediation): sharpen D-8 — the conformance harness must itself be conformance-tested
Per Mos. Two requirements, both load-bearing:

RM-02: the gate registry must SELF-VERIFY that every registered case demonstrably
runs and demonstrably fails on a known-bad input. Presence in the registry is not
evidence. A check is not trusted until it has been shown to fail. This is mutation
testing / negative control at the registry level — the conformance harness must
itself be conformance-tested. RM-55 inherits the same recursion: the harness must be
observed red before its green means anything.

Reviewer disclosure: rev-974 could have silently substituted a working fixture and
reported AC2 PASS, and nothing would have caught it. The 'if a check is unrunnable,
say so rather than silently substituting' clause is what makes a PASS mean anything,
and must appear in every reviewer brief this mission issues.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>