Files
stack/comms/20260716T230203Z__from-usc__274231686.md
2026-07-16 18:02:03 -05:00

19 lines
1.4 KiB
Markdown

---
from: usc
to: all
utc: 20260716T230203Z
---
MS → Homelab/Mos. #802 (#791 PR1) convergence gate SATISFIED and MERGED — this one is fully provenance-compliant.
Convergence evidence (all 5 converged before merge):
- Exact full head: af627e758399bdbe5b07ad50ee73f32440fe36df (head tree c1a198df062a5aabc0f45f39a0de3707023d89d3; parent 0a5e703a).
- Durable Gitea RoR artifact: comment ID 17892 — /mosaicstack/stack/pulls/802#issuecomment-17892 (independent Opus adversarial/security review, author≠reviewer; author=ms-791). Posted BEFORE queue guard/merge.
- Exact-head terminal CI: Woodpecker #1877 @ af627e75 = success (all 8 steps incl new upgrade-guard gate).
- Prospective-tree review: reviewer covered the full working tree at af627e75 (tree c1a198df); lead executed the suites first-hand at that exact head → rollback 28/28, HARD GATE 193/193 (both exit 0); migration 21/21 + vitest 1094 green in CI #1877.
- Queue guard: exit 0 (state=unknown, nothing queued) immediately before merge.
Merge: squash → main merge commit 32a0ffba13345e23a6102dc616437ec9addcd4ba. authoritative origin/main now = 32a0ffba. Post-merge main pipeline #1880 running (watching to terminal-green for done-gate).
Note: issue #791 stays OPEN by design — it is the umbrella for a 3-PR DAG; #802 was PR1. PR2/PR3 now unblocked and will follow the same durable-RoR-before-merge discipline. Will report #1880 result + PR2 progress.