One cumulative control-board, webui and seat state. The four rows edit the
same files (scan.mjs, page.html, README.md, app.js), so they land together,
each on its own receipt:
- Row 18, Discord connector rows on the board (#1509): R3 approved by
Darkwing and Dewey, Gitea comment 26257, manifest 254403b8. Jason
accepted the visual test.
- Row 22, board attention status (#1503): Filbert approved R1, comment
26248, manifest e40b58ec; restart receipt 26249.
- #1511, task attribution (row 6 code phase): R2 approved by Filbert and
Dewey, manifest d4c96395. docs/TOOLS.md carries the approved --by usage
line (tools-usage.patch 86bcba3c).
- #1512, relaunch activity (row 6 pilot): R1 approved by Darkwing and
Dewey, candidate manifest 47769fad. All seven source files match it.
Row 16, internal development bootstrap (#1510): the seven files outside
shared records match Filbert's R1 pins, receipt 26204 (agents/researcher/*,
scripts/test-darkwing-launch.mjs, the bootstrap plan).
packages/webui/src/public/app.js is committed at its #1512 R1 pin ce7d79a4.
The working copy holds Dewey's unreviewed return-flow candidate on top of
that, and it stays uncommitted.
Also: the four row briefs and Darkwing's evidence records under
agents/darkwing/work, including the 2026-09-26 tree manifest and the #1512
re-run against 21e3e908. Serial acceptance command: 397/397, three runs.
The failures that only show when tests run concurrently are in #1509 engine
tests, and they reproduce on clean HEAD.
Suites on the exact staged tree: config 24, task 90, foundation 43,
conductor 17, release 14, auth 15, discord 63; package union 397/397
(serial); test-darkwing-launch 5/5.
Shared records (BUILD-LOG, QUEUE, CURRENT, DEFERRED, SESSIONS, AGENTS.md,
agents/README.md) follow in Sage's records commit.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
36 lines
2.1 KiB
Markdown
36 lines
2.1 KiB
Markdown
# Relaunch activity, row 6 behavior assignment
|
|
|
|
Jason confirmed the #1511 table tag and inspector wording. The code phase's
|
|
bounded local delivery is accepted. Under his standing continuation mandate,
|
|
start Piece 5's already-specified first Filbert assignment from the control-board
|
|
MVP plan: Relaunched seat shows the old last message.
|
|
|
|
Filbert is sole source author. Darkwing independently reviews backend and tests;
|
|
Dewey reviews presentation. Work in the canonical refactor checkout. Preserve
|
|
accepted attention, Discord and task-attribution changes and all other owners'
|
|
changes. Frozen prior candidates remain unchanged.
|
|
|
|
Scope: minimal packages/control-board scanner/presentation/tests/docs changes
|
|
and corresponding WebUI presentation/tests when needed. If a live matching
|
|
registration's startedAt is newer than recorded session activity, show
|
|
'relaunched at X, no messages since' instead of presenting an old message as
|
|
current activity. Preserve historical transcript data. After new session activity,
|
|
normal presentation resumes. Stale/dead registrations must not assert a relaunch.
|
|
No effect on connector owner identity or fixed connector task.
|
|
|
|
Prove the old behavior first with isolated fixtures. Cover newer launch vs old
|
|
activity, equality, subsequent new activity, stale registration and unknown/missing
|
|
activity. Preserve attention/Seen, task attribution and reply authorization.
|
|
Do not silently redesign those semantics. Return an exact frozen candidate,
|
|
changed/inherited pins and reproducible tests for both independent reviewers.
|
|
|
|
No launcher, Claude discovery, credential, role, home, live registration or
|
|
service changes by the author. No commits/push or shared tracking edits by the
|
|
author. No real seat relaunch is needed for the source fixture tests. Darkwing
|
|
owns tracking and any separately authorized integration.
|
|
|
|
Publication remains a separate gate, including prior unpublished dependencies.
|
|
Do not claim Gate F or issue closure from fixture tests. Its eventual evidence
|
|
must use the actual assignment dates and demonstrate no direct Jason-to-Filbert
|
|
work messages; never backdate the old plan's anticipated 2026-09-13 metric.
|