W2 adopt on Mos's go with Jason present, W2b pointer check (copy 52f35e7a0,
schema 3f) before W3, W3 plan line-by-line match against Darkwing's scratch
rerun, and the W2 undo: remove the pointer only. Landing commit 7e7f8e208.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
New scripts/stack-release.sh with four verbs. adopt records the running
copy, the unit flags and the store schema in state/stack-active.json; it
stops nothing. activate ID BUSINESS [--pm] [--migrate] stops the units,
checks the stopped store, backs it up, migrates when the target's schema
differs, installs and starts the target, then gates on both units active,
a live bus host whose pid is the bus unit's MainPID with boot ok, Console
/healthz, stack-copy.sh check and one launched journal line. A failed
gate rolls back inside the same run and keeps the attempted store as
bus.post-attempt-<stamp>. rollback [--restore ACT [--events N]] goes back
to the log's previous copy and counts the events written after the
backup. status prints the pointer, the log tail and the copy check.
--plan prints what a run would do and writes nothing; it reads the store
schema from the store the running bus holds, or from a stopped store.
Exit codes: refusal 3, gate failure with rollback 1, rollback failed 2,
usage 4. Nothing is pruned.
stack-copy.sh gets a reachable function split from copy_commit and a
guard so its helpers can be sourced. TOOLS.md "Pinned stack update" and
the cli README pinned-stack paragraph describe the verbs.
Owner Darkwing, brief docs/plans/2026-10-18_stack-release.md (D1).
Reviewer Filbert: r1 approve (comment 28997) on 091693c5, r2 confirm-only
approve (29004) on candidate manifest c213a801...bd15c after row 125
moved the base under TOOLS.md and the cli README. Sage gate on 23622980f:
25 of 25 steps rc=0 on c96a95320 (15 packages + 10 scripts), node pass 2353 fail 0, selftests 422 passed 0 failed, 2026-10-18T20:32:13Z to 20:38:55Z, network sage-r162_default removed, 0 containers.
Nothing live. The 8e7ea89a1 window (repin-8e7ea89a1.md) runs these verbs
on Mos's go with Jason present.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Row 125's core lets a check see only launch.limits and accept hits on the
four DEPTH kinds, so the quota gets its own depth-1 kind,
tokens.daily.<account>, in the two DEPTH tables and the organization-file
schema. Display is a fixed line keyed on the daily path; no report field.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Adds token limits under launch.limits.tokens (instances, providers, keys,
models.P.M). Core (packages/bus/src/limits.mjs) reads the organization
file and the per-turn usage records row 124 writes, then asks every
switched-on limit-check plug-in; the first refusal wins. A limit no
switched-on check reports reads "not enforced". The limit-check kind is
interface 2 (mayLaunch, mustStop, report); a v1 check is refused at load.
The shipped token-limit check is pure and counts known end records only;
unknown turns add nothing and are shown as their own count.
The launcher refuses limit-reached through the host's mayLaunch op, or
limit-check-failed naming the check. The broker asks mustStop after a
usage end and stops the run at its next receive or state. Settings stamps
since on a new or changed limit and runs reset; launch.mjs and
business.mjs validate the shape. Readers: mosaic limits and mosaic limits
reset, the bus limits view, the Console /api/bus/limits route and the
Settings token table with Reset. Key limits stay "not enforced" until
row 126 names accounts on records.
Owner Dewey, design under lead decision 150.
Reviewer Filbert: r1 changes (comment 28965), r2 approve (28981), r3
approve (28996) on candidate manifest 8b71c405...fe56 after the rebase
onto row 164 (37 of 38 paths with identical +/- lines, TOOLS.md:621
bracket). Decision 123 go on the bus.js hunk from Mos (mos-0814). Sage
gate on b6827d19e: 25 steps, all rc 0 (15 packages, 10 script suites), 2295 node tests and 422 script selftests, 0 failed, 20:03:25Z to 20:08:08Z, network sage-r125_default removed.
Live stays as pinned. Not part of the 8e7ea89a1 window.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Records Jason's "Q4: yes" (DECISIONS Q171, Q172) and lifts the hold.
The row moves to briefed once row 155 is done. No test reads this file.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Adds plugin kind `channel` (interfaceVersion 1, dispatch(request, {call}))
with cli and webui modules. Project and thread surfaces and thread
talk/follow in the CLI and the Console chat go through the selected
channel. An empty or absent channel selection is off: the CLI exits 3 and
the Console answers 503, each naming `mosaic plugins` and `mosaic plugins
set` with the business selector. Management plugins and plugins.set stay
on the core transport. The loader gains a synchronous snapshot(kind)
getter; loaded(), modules() and last-good handling are unchanged. No lock
is held across dispatch. serve.mjs, public/ and the bus are untouched.
Owner Rocko. Reviewer Dewey: r1 changes (comment 28980, B1: the recovery
sentence was never asserted), r2 approve (comment 28984) on candidate
manifest ae2fcfda...1fc8, the B1 assert killing mutant D1. Design accepted
by Mos (mos-0768, mos-0773). Fixture rewrite at project.test.mjs:47 acked
by Mos (mos-0789) on Dewey's line-by-line check: lines 48-51 identical,
one added assert. Sage gate on e5b10d275: 25 steps green, 2081 package tests, 156 queue node tests, 422 script selftests, 0 failed.
Live stays as pinned. The re-pin that takes this live puts `mosaic
plugins set` in Jason's window right after activate (mos-0768).
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Mos relayed Jason's answers in mos-0787. P19 332: a CLI command and a
Console view for role-instance changes, held until Jason confirms Mos's
reading. P19 333: accepted as a documented limit, so the I6 brief and the
design's limits line now say I6 writes it as a known limit.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Adds the Console chat view: project and thread lists, named create forms,
per-thread drafts, explicit Resume, paging and signed-in sends. The one
HTTP-to-bus seam is packages/webui/src/chat.mjs, with fixed routes in
chat-http.mjs: exact HTTPS Origin, same-origin fetch site, JSON content
type, and 403 for each. Every label and message body renders inert,
including bidi controls. CSP unchanged, no inline script.
Owner Rocko. Reviewer Filbert: r1 changes (comment 28933), r2 approve
(comment 28950) on candidate manifest 9a665434...4034, with the four r1
survivors killed by new assertions. Mos decision 123 go on the public/
diff, sha 78574095 (mos-0780). Sage gate on 19fe85c3e: 25 steps, node
2216/0, scripts 422/0, webui 179/179.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
New roles:
- roles/security-reviewer.json and .md: read tools only, review.verdict
within its role, no cross-role grant and no credentials, one verdict per
request.
- roles/merge-gate.json and .md: read tools only, cross-role
git.merge.protected only. It raises with domain technical and the task
ref, and lands with land_work once the decision resolves, the verdicts
approve and the gate passes. The chief of staff messages the relaunched
instance with the task ref and decision id (round 3 finding 28913).
Contracts:
- All 13 roles/*.md carry the proactive line in their Authority section.
- pm and chief-of-staff carry the REQ-DEC-2 routing paragraph. Its eight
hard waits are pinned to GATED_ONLY by a test.
Harness: raise_decision takes an optional domain, technical or delivery,
defaulting to delivery. The tool description says where each kind of raise
goes. end_run is unchanged (row 155).
Tests are new files only: business and bus workflow-roles tests and
harness raise-domain. Builder Dewey; Filbert approved round 4 (comment
28929) on manifest 6b4af9c2685b, base 0f715a054 plus build.patch
df0fec543dba.
Gate on 806ab89df plus the candidate, 16:34:57Z to 16:39:43Z: 2027
package tests and 422 script selftests (plus the queue suite's 156 node
tests), 0 failed. Doc-only follow-ups: business README:194-196 and the
launch.instances doc line.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Row 126's daily quota is a second limit check with no launcher or bus
change, so it needs row 125's launcher and bus calls. Its after listed only
row 124. Row 125 moves from researcher, who is on row 154, to dewey, so the
two limit-check rows run in order with one owner.
Co-Authored-By: Claude Opus 5.5 <[email protected]>