Commit Graph
26 Commits
Author SHA1 Message Date
jason.woltje ad21ad7ac5 docs: ratify PRD rev1 — consolidated bundle, permanent shim, rev0 archived
ci/woodpecker/pr/ci Pipeline failed
Ratifies the Mosaic Stack PRD rev1 (Jason Woltje, 2026-09-01) as project
source of truth and installs the GOV.1 lifecycle model:

- docs/PRD.md becomes a permanent shim (kind: shim, current_rev ->
  docs/PRDs/2026-08-31_PRD_rev1/). Its path never changes again.
- docs/PRDs/2026-08-26_PRD_rev0/PRD.md archives the 2026-08-26 North Star
  verbatim (sha256 60cc2f98...36afdf unchanged). Archive, never delete.
- docs/PRDs/2026-08-31_PRD_rev1/ is the frozen rev1 bundle: 18 sectioned
  documents (VIS, DATA, AUTHN, AUTHZ, SEAT, ROLE, HARN, PROV, SESS, UI, CLI,
  GOV.1-5) consolidating rev0 D1-D15, the fleet north star, the agent-runtime
  L1/L2 contracts and the control-plane-surfaces lane findings, with a single
  decision map (GOV.3) and a closed open-questions frontier (GOV.5, grill
  rounds 1-8). Drafting inputs (_source-* snapshots) are not shipped.

Consequences of the ratified rulings carried in the same change:

- Q-T1 (ruling B, "shipped but frozen"): D3 amended in GOV.3/VIS.1;
  federation M1-M3 acknowledged as shipped behind tier === 'federated',
  excluded from the v1 bar and frozen, with a security re-audit gate before
  any resumption. docs/MISSION-MANIFEST.md, docs/federation/MISSION-MANIFEST.md
  and docs/scratchpads/mvp-20260312.md get status: superseded + banners
  (content preserved verbatim); docs/guides/deployment.md gains a
  "Relationship to the PRD (D15)" section. NORTH_STAR.yaml adds dormant
  workstream M (projects no goals by design); NORTH_STAR.md regenerated.
- Q-G2 (distinct registry prefixes): every citation of the operator
  DECISION-REGISTER in the bundle reads OD-nn; the stack registry stays
  D1-D15; L1-Dnn/L2-Dnn untouched. Prefix rule recorded in GOV.1.

Follow-ups (not in this PR): CI parity drift-gate witness (Q-C1); brain-side
DECISION-REGISTER rename to OD- with redirect table on its next touch.
2026-09-01 18:32:14 -05:00
veronicaandfred a480ee83dc docs(W4): document contract — stamp kind and status on 104 live docs (#1350)
ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
2026-08-21 14:07:36 +00:00
jason.woltje e64ddd2c1c docs(federation): M3 mission planning — 14-task decomposition (#504)
ci/woodpecker/push/ci Pipeline failed
ci/woodpecker/push/publish Pipeline was successful
2026-04-24 01:13:40 +00:00
jason.woltje 9f1a08185e docs(federation): S21 tracking — DEPLOY-01/02 done, IMG-FIX in flight, M2-01 in remediation (#487)
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/push/publish Pipeline was successful
2026-04-22 02:02:36 +00:00
jarvis b9fb8aab57 docs(federation): close FED-M1 milestone
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
- TASKS.md: mark FED-M1-12 done with PR/issue/tag references
- MISSION-MANIFEST.md: phase=M1 complete, progress 1/7, M1 row done with PR range #470-#481, session log appended
- scratchpad: Session 19 entry covering M1-09 → M1-12 with PR ledger and M1 retrospective learnings

Refs #460
2026-04-19 21:12:52 -05:00
jason.woltje 1e2b8ac8de test(federation): standalone regression canary — no breakage from M1 (FED-M1-09) (#478)
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/push/publish Pipeline was successful
2026-04-20 01:46:35 +00:00
jason.woltje 4c2b177eab feat(gateway): tier-detector with fail-fast PG/Valkey/pgvector probes (FED-M1-04) (#473)
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/push/publish Pipeline was successful
2026-04-20 00:07:07 +00:00
jason.woltje 9c89c32684 feat(config): add federated tier + rename team→standalone (FED-M1-01) (#470)
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/push/publish Pipeline failed
2026-04-19 23:11:11 +00:00
jason.woltje 8aabb8c5b2 docs(mission): author MVP rollup manifest, archive install-ux-v2 (#469)
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/push/publish Pipeline was successful
2026-04-19 22:51:11 +00:00
jarvis 774b76447d fix: rename all packages from @mosaic/* to @mosaicstack/*
ci/woodpecker/pr/ci Pipeline failed
ci/woodpecker/push/ci Pipeline failed
- Updated all package.json name fields and dependency references
- Updated all TypeScript/JavaScript imports
- Updated .woodpecker/publish.yml filters and registry paths
- Updated tools/install.sh scope default
- Updated .npmrc registry paths (worktree + host)
- Enhanced update-checker.ts with checkForAllUpdates() multi-package support
- Updated CLI update command to show table of all packages
- Added KNOWN_PACKAGES, formatAllPackagesTable, getInstallAllCommand
- Marked checkForUpdate() with @deprecated JSDoc

Closes #391
2026-04-04 21:43:23 -05:00
jason.woltje d5a1791dc5 docs: agent platform architecture plan — augmentation + task breakdown (#173)
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-16 01:28:29 +00:00
jason.woltje bd81c12071 docs: update TASKS.md and scratchpad for CLI command architecture (#159)
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-15 23:11:37 +00:00
jason.woltje cd57c75e41 chore(orchestrator): Phase 7 complete — v0.0.8 verified (#154)
ci/woodpecker/push/ci Pipeline failed
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-15 19:50:15 +00:00
jason.woltje ea800e3f14 chore(orchestrator): Phase 7 planning — 10-wave execution plan (#135)
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-15 17:47:55 +00:00
jason.woltje fcd22c788a chore(orchestrator): rescope Phase 7 + add Phase 8 (#118)
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-15 17:32:37 +00:00
jason.woltje 7d04874f3c chore(orchestrator): complete Phase 6 milestone v0.0.7 (#105)
ci/woodpecker/push/ci Pipeline was successful
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-15 01:07:14 +00:00
jason.woltjeandClaude Opus 4.6 6e22c0fdeb chore(orchestrator): complete Phase 5 milestone — v0.0.6
ci/woodpecker/push/ci Pipeline was successful
- P5-005 done: Telegram plugin wired, .env.example updated
- PR #99 merged, issue #45 closed
- Phase 5 complete, advancing to Phase 6

Co-Authored-By: Claude Opus 4.6 (1M context) <[email protected]>
2026-03-14 19:06:23 -05:00
jason.woltje 9eb48e1d9b feat(Phase 4): Memory & Intelligence — memory, log, summarization, skills (#91)
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-13 13:56:50 +00:00
jason.woltje d83ebe65e9 verify(P3-008): Phase 3 web dashboard verification (#90)
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-13 13:37:43 +00:00
jason.woltjeandClaude Opus 4.6 b03c603759 docs: mark Phase 2 complete — update manifest and scratchpad
Phase 0-2 all done. P2-007 closed via PR #79. Mission advances to Phase 3.

Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 22:40:59 -05:00
jason.woltje 2b1723e898 feat(db): @mosaic/db — Drizzle schema, PG connection, migrations (#67)
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-13 02:17:18 +00:00
jason.woltjeandClaude Opus 4.6 bf2cb3a271 docs: mark P0-002, P0-005, P0-006 done (PR #65)
Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 20:56:16 -05:00
jason.woltjeandClaude Opus 4.6 04528459ec docs: update TASKS.md and scratchpad for communication spine completion
Mark P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 as done (PR #61).
Add session 2 log entry for vertical slice delivery.

Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 20:34:26 -05:00
jason.woltje 6d0d288e31 feat(P0-001): scaffold monorepo structure (#60)
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-13 01:11:46 +00:00
jason.woltjeandClaude Opus 4.6 339641352e docs: record vertical slice reorder in scratchpad
Jason directed: build Pi TUI → Gateway → Discord communication
spine before backfilling horizontal layers.

Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 20:06:17 -05:00
jason.woltjeandClaude Opus 4.6 e7f338e3a9 chore: planning gate — milestones, issues, and task breakdown
Break PRD into 8 milestones (Phase 0–7) with 59 issues on Gitea.
Populate TASKS.md, update mission manifest, initialize scratchpad.
Repo created at git.mosaicstack.dev/mosaic/mosaic-stack.

Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 19:51:51 -05:00