Row 90, round 2. Dewey built it, Filbert approved it (comment 28068) on
manifest 95611274 (21 paths, base b8539480). The approved PRD's
requirement ids live in packages/tasks/requirements.json. task_create
refuses an id outside it, and the PM session gets a list_requirements
tool. Round 2 adds requirements.mjs to the sandbox's RUNNER_FILES
(decision 127). Sage gate on c047d028 plus the patch, 23:50:16Z to
23:54:26Z: tasks 89, bus 111, harness 66, webui 101, cli 123, seat 33,
business 60, control-board 124, queue 150, conversation 182, discord 178,
ledger 78, runs 43, mosaic 69, all fail 0. Every scripts/test-*.sh
exited 0.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
Row 63, round 2. Task verbs act in any installed project of the tree;
a project the tree doesn't hold refuses task-project as before, and a
watch-only one refuses with the new code. The harness task_create tool
takes an optional integer project. Round 2 adds Dewey's five proof
tests and Filbert's N1 child-path tests; the code is round 1's.
Candidate manifest 2a22fd3f (agents/darkwing/work/queue-63/r2/), base
cca5f23e, no drift on the six paths. Builder Darkwing. Approved by
Dewey (comment 28024) and Filbert (comment 28026). Sage's gate on
1117d19b plus the patch 2026-10-12T23:07:33Z-23:09:22Z: tasks 84,
harness 65, every scripts/test-*.sh green.
Lands before row 90 (decision 125). The harness change is live at the
next role session launch (decision 109); Mos had the notice.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
packages/tasks adds the Vikunja v2 client, the eight task verbs, the
board-plus-cursor poll with its 60 s window and the digest. The broker
gains the task verbs and boots trackers from the boot config (lead
decisions 66 to 68). Due dates are truncated to the second and recorded
as truncated (B1). A write that lands but whose final read fails counts
as landed, in update and in create (B2).
Candidate agents/darkwing/work/slice1-s3, build-r2.patch 71ce87e6,
manifest e10e30e3 (28 files). Filbert approved round 2 on #1520
(comment 26853). Darkwing's post-reset rerun: test-release 14/14,
test-task 98/98 (comment 26857).
Integration gate in a worktree on c4baf779 with the patch applied:
bus 67, business 60, control-board 124, discord 173, ledger 78,
mosaic 69, queue 148, seat 19, tasks 51 and webui 14, all with no
failures. Conversation is 149/3. The three cohort kill cases (K1, K3,
K10) fail the same on the unpatched base, and the patch doesn't touch
the package. Every scripts/test-*.sh is green. test-release 14/14 and
test-task 98/98 ran on the existing gate2 compose network, because the
host's Docker address pools are exhausted. No network was created or
pruned.
Co-Authored-By: Claude Opus 5.5 <[email protected]>