chore(sync): merge main → next (B1) — restore next current, resolve 8 conflicts (#1041)
Brings next current with main incl the RM-03 guard fix (482/5); preserves next's 10 in-flight commits. Closes#1040.
--next now prefers a fast npm @next install (CLI + gateway from the Gitea registry) and falls back to source build at next if the dist-tag is unavailable. Registry lane gated to non-dev, non-explicit-ref next installs; CLI/gateway prerelease versions must share a pipeline suffix. Adds tools/install-next-lane.test.sh (wired into CI). PR-event CI 1635 fully green + review-of-record APPROVE (functional install test, head 2fd7cfc3).
Co-Authored-By: Claude Opus 4.8 <[email protected]>
Durable @next integration-line publish: on next pushes, compute <patch+1>-next.<pipeline#> prerelease versions (in-CI, uncommitted) and publish @mosaicstack/* under the next dist-tag; gateway image sha-only on next. Strict guardrails: next-only, never writes latest, never tags from next; main path unchanged. PR-event CI 1631 fully green + review-of-record APPROVE (head b1a887a2). Guardrails independently verified.
Co-Authored-By: Claude Opus 4.8 <[email protected]>
FED-M3-10 integration tests for the federation M3 verbs (list/get/scope). Test-infra + docs only; green PR-event CI 1623 (all steps incl ci-postgres).
Co-Authored-By: Claude Opus 4.8 <[email protected]>
FED-M3-06 get verb. Trust boundary mirrors M3-05 AND-intersect (note returned only when owned by subject AND on an authorized mission). Reviewed (review-of-record APPROVE, head 80a259b2) + green PR-event CI 1620.
Co-Authored-By: Claude Opus 4.8 <[email protected]>