jason.woltjeandClaude Opus 5.5 2333d837e2 docs(records): lead decision 40, Piece E questions (row 13, #1508)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-27 11:04:28 -05:00
jason.woltjeandClaude Opus 5.5 cdcedb2741 docs(records): lead decision 39, helper lead check passed, C1 in D (row 12)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 21:45:23 -05:00
jason.woltjeandClaude Opus 5.5 4c53f8c738 docs(records): lead decision 38, Gitea helper round 2 disposition (row 12)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 21:39:10 -05:00
jason.woltjeandClaude Opus 5.5 d2813a4b6b docs(records): lead decision 37, raw per-seat token files in the Gitea helper (row 12)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 20:25:02 -05:00
jason.woltjeandClaude Opus 5.5 8ffbd73b76 docs(records): lead decision 36, row 10 build note, export recipe limit (#1508)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 20:24:24 -05:00
jason.woltjeandClaude Opus 5.5 6ca116b7ba feat(queue): queue as data A2, migration, render and dispatch (#1508)
Filbert approved round 1 (f167b85e). Manifest 782bcb62, 21 files, plus
the QUEUE.md markers and the TOOLS.md section. Lead decision 35.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 20:14:09 -05:00
jason.woltjeandClaude Opus 5.5 c9539baa0f docs(records): CHAT-03 build note for unexplained aborted, lead decision 34
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:45:26 -05:00
jason.woltjeandClaude Opus 5.5 8a465e891a docs(chat-03): brief pinned at 1ef15ac0 after r3 and scope check, lead decision 33 (#1507)
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:45:04 -05:00
jason.woltjeandClaude Opus 5.5 77680e0b22 docs(records): CHAT-03 r3 closed with two rulings, lead decision 32
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:39:00 -05:00
jason.woltjeandClaude Opus 5.5 8dba3ff797 docs(records): CHAT-03 seal loads no explicit extensions, lead decision 31
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:34:06 -05:00
jason.woltjeandClaude Opus 5.5 f0296e7763 docs(records): CHAT-03 rescoped against Gate E, lead decision 30
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:31:38 -05:00
jason.woltjeandClaude Opus 5.5 4bdd3fc3b0 docs(queue): close rows 1, 6, 23, 24, 25 and issues 1503, 1509, 1511, lead decision 29
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:28:13 -05:00
jason.woltjeandClaude Opus 5.5 9da0d0895f docs(records): SetSpark approver fix deployed and surveyed, lead decision 28
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:24:20 -05:00
jason.woltjeandClaude Opus 5.5 f2b9e622da docs(plans): goals review with ledger evidence, lead decision 27
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:21:33 -05:00
jason.woltjeandClaude Opus 5.5 34a72af912 feat(queue): queue as data A1, journal, lock, CLI and verify (#1508)
packages/queue, scripts/queue-commit.sh, scripts/git-hooks and
scripts/test-queue.sh, plus docs/plans/BRIEF-TEMPLATE.md. There is no
queue.json yet, so verify skips until the genesis commit after A2.

Darkwing built it, and Filbert reviewed R0 (6933b885, changes requested)
and r1 (e464be6c, approved). The 20 files match manifest 85a8a453. The
nine suites passed on an index export, including the new queue suite.
test-queue.sh joins the suite list in AGENTS.md. Lead decisions 20, 23
and 26.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 19:07:48 -05:00
jason.woltjeandClaude Opus 5.5 91df7d6b54 docs(records): CHAT-03 deviation V-1 accepted with limits, lead decision 25
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 18:58:22 -05:00
jason.woltjeandClaude Opus 5.5 f87cd6e201 docs(records): SetSpark approver fix landed in shared-signals cc74d92, lead decision 24
Packet, Rocko's R1 and R2 reviews, DEFERRED outcome and SESSIONS.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 18:52:04 -05:00
jason.woltjeandClaude Opus 5.5 40a02d2bcb docs(records): queue A1 review rulings, lead decision 23
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 18:25:52 -05:00
jason.woltjeandClaude Opus 5.5 556772ceb2 docs(records): CHAT-03 chartered, SetSpark approver owner, lead decisions 20 to 22
Jason approved CHAT-03 and gave Sage the SetSpark approver owner choice.
Decision 20 records the queue A1/A2 split. Decision 21 makes the SetSpark
fix Mosaic's through a Sage subagent and keeps the sanctioned pending:
approver markers so the cutover migration still works. Decision 22 charters
CHAT-03 with Dewey writing the brief. QUEUE row 5, DEFERRED and SESSIONS
updated.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 18:14:02 -05:00
jason.woltjeandClaude Opus 5.5 a4d38a3d93 docs(records): row 25 live check passed, SetSpark approver gap has no owner
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:42:17 -05:00
jason.woltjeandClaude Opus 5.5 a68dc1740a docs(records): CHAT-02 build log, Gate F commit, snapshot isolation gap
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:40:23 -05:00
jason.woltjeandClaude Opus 5.5 e58783d278 docs(records): CHAT-02 backend commit and board restart
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:37:07 -05:00
jason.woltjeandClaude Opus 5.5 c5db8c8819 docs(records): row 25 approver fix, second Discord restart, SetSpark approver and docker network gaps
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:31:11 -05:00
jason.woltjeandClaude Opus 5.5 1c5f6bc3a0 docs(queue): queue-as-data plan round 6, Rocko approved (#1508)
Plan 282fabbb (Filbert) and the six adversarial rounds (Rocko, r6 80cde839).
Lead item 15: Gate F first, then A1 and A2 as separate reviewed commits.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:05:16 -05:00
jason.woltjeandClaude Opus 5.5 ffc22c04c6 docs(ledger): Gate F T3 thread source brief R2, Filbert approved (#1506)
Brief e8300cb6 (Darkwing), review bb02d8d3 (Filbert, approve with three
nits), R1 record and R1-to-R2 diff. Lead rulings in item 14.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 16:04:56 -05:00
jason.woltjeandClaude Opus 5.5 34777c56bc docs(records): row 25 SetSpark fix, Discord restart receipt, Gate F rulings
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 15:58:59 -05:00
jason.woltjeandClaude Opus 5.5 f55b94e866 docs(records): board guard live, restart receipt
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 15:40:56 -05:00
jason.woltjeandClaude Opus 5.5 401cc850bb docs(records): correct walkthrough ruling times from the transcript, note 6b R1 verdict
Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 15:36:03 -05:00
jason.woltjeandClaude Opus 5.5 993673865a docs(records): Jason's walkthrough rulings, Sage moved to SetSpark, CHAT-02 go
Jason ruled on seven open items (20:27Z-20:45Z): seat Gitea tokens read in
place, one Discord restart after 6b with row 25 live, row 8 limited to the
dev seats, DYOR in dyor-stack-v4 with Sage moved to SetSpark, skills/aws-*
excluded locally, no second WebUI return defect, and go on CHAT-02 only.

Sage persona files name SetSpark as its business work. Darkwing's SOUL drops
harness names that were wrong for T3. DEFERRED adds the slash-prefix paste
hazard and the board Host/Origin gap, and moves the ledger T3 item to Done.
Dewey's approved CHAT-02 brief (636b0fac) and Filbert's review are recorded.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 15:35:15 -05:00
jason.woltjeandClaude Opus 5.5 d41f81aafe feat(agents): Sage launch files, lead text across seat personas, lead decision record
- agents/sage/ launch files committed after Dewey's review (R1 revise, R2
  approve). The launcher test now covers sage with its zai/glm-5.3 high pin.
  The README states the lead role and its limits, and the seat reads but
  never writes the old DYOR records under ~/.mosaic.
- N6 (Dewey authored, Sage reviewed against pins): seat personas and the
  Rocko launcher name Sage as project lead and Darkwing as a collaborating
  engineering seat, per Jason's 2026-09-26 ruling.
- docs/plans/2026-09-26_lead-decisions.md: the push, no merge into next and
  its conditions, the board restart, queue-as-data rulings, Gate F waiting
  on a T3 source, and what stays with Jason.

Launcher tests 6/6 and 1/1, eight suites green. Not pushed.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 15:11:10 -05:00