git mv packages/business -> packages/organization (@mosaic/organization). The
old package stays as one-line re-export shims of each moved module, with
src/business.mjs re-exporting src/organization-config.mjs and src/cli.mjs
forwarding to the moved executable. BusinessError is OrganizationConfigError
(one constructor, name kept BusinessError); OrganizationError stays distinct.
The bus adapter gains organization-context.mjs (busOrganization), with
business.mjs (busBusiness) as the same function.
Import consumers, manifests, the lockfile, scripts/mosaic, stack-copy.sh
COPY_PATHS (both roots), seat sandbox RUNNER_FILES and the copy closure
walker (organization-imports.mjs, both roots required) move to the new path.
v1 serialization, v1 writers and the stage A fixtures are unchanged; the stage
A contract tests stay where they were and pass as before.
Guard, limits, M11 fence, broker guard/page store/check event, BusError
reason, runtime wiring and the CLI replies verb. No runner work, no tests,
nothing run. BUILD.md lists the rulings, the row 225 contract and what is left.
checkMapping takes kind absent, hybrid or draft. A draft has a name and one
or more prefixes and no books, and comes back with books []. A prefix inside
or holding another entry's book refuses library-playground-other-universe,
which replaces library-playground-outside-book. A prefix equal to a book or
holding its own refuses library-mapping-invalid, as does a draft source.
classify returns a playground file's entry and the book holding its prefix,
or null at universe level and in a draft.
Doc-only commit after the row 254 landing. The library README now says
that a sync outlasting the server's 120-second hold gets request-timeout
and still finishes (Dewey N1, #1759 comment 30173; server.mjs sets the
120 s socket timeout and the broker promise runs on). DEFERRED records
Dewey N2: library-mapping-invalid, library-remote-invalid,
library-state-invalid and library-git still map to 502 until the Console
library routes row decides them. No test reads either file's content.
Candidate megavolt/row254 b31300d79 on c3d88840c, manifest be63cfbe
(7 paths). Dewey APPROVE r1, rev 3006 (#1759 c30173). Gate on Sage's
slot by Megavolt, 23:37:27-23:40:52Z on b31300d79: library 77/77, bus
628/628, webui 305 pass with 1 skip (editor rebuild needs esbuild
0.28.2), every scripts/test-*.sh rc 0; the human-cli timeout and
library-fetch-failed STATUS mutants killed by their behaviour tests.
Landed onto 41b0cf755 with the candidate's blobs and modes for the 7
paths; c3d88840c..41b0cf755 touches none of them. Merged-tree rerun of
library, bus, webui and cli on Sage's slot before the push.
The business file accepts a kind "library" project entry, and each consumer
that assumed a project root skips it. An organization write whose projects
differ from the file's is refused (M9). The bare mirror is created at the
projectRepo path with no remote. library.file and library.status are human
only and refuse an agent session with human-required.
Candidate herb/row215-on197 dde3445ab on a36523713, Filbert APPROVE rev 2924.
Lands Gosalyn's round 2 candidate, f37a65857 on gosalyn/c2-01b-r2 (base fefd54e13; commits 3647a5a93,
88daaac50, f37a65857), approved by Webby at merge scope (webby-0072, REVIEW-r2 efd6c1f02 on webby/reviews,
#1733 comment 30005, rev 2787). Nine paths, manifest 312c16fc4f65. No 231 path changed between fefd54e13
and this commit's parent. Patch-id 59b98b1b3e00, the same as fefd54e13..f37a65857.
Evidence: Gosalyn's singles on my slot, 61/0 on r2 (gosalyn-0099; run 1 60/1 was a test order defect).
Gate on my slot, 10:05:31-10:07:52Z on 62ddc96cc plus the nine paths: library 45/0, and every scripts/test-*.sh
green (auth 15, conductor 17, config 31, discord 78, extension-package 18, foundation 44, land-work 86,
queue 156 and 28, release 14, task 98, all 0 failed).
Webby's N4 (README:88 "A link to ... an attachment is R4" next to the embed paragraph) is doc-only and
stays as restored (sage-1917).
Lands Gosalyn's round 3 candidate, a2c72ac95 (commit candidate, base c771a36f4), approved by Webby
(29979, rev 2731). 21 paths: the new packages/library (src, tests, fixtures, package.json, README),
scripts/stack-copy.sh (packages/library/src in COPY_PATHS), packages/cli/tests/stack-copy.test.mjs,
scripts/mosaic and agents/gosalyn/work/queue-212/BUILD.md. The 21-path patch-id, ea84d3e35470, equals
the candidate's.
Evidence: Gosalyn's slot run on round 3: 20 files 451 pass, 0 fail; test-queue 28/0 (gosalyn-0086).
Landing gate (Sage, 08:51-09:03Z, base 4ced5e63d) on a tree that also held row 197's 32 paths:
GATE_PASSED, node tests 981 pass 0 fail (library 39, cli 681, control-board 38, harness 16, webui 51, plus
the scripts/test-*.sh node suites), selftests 429 passed 0 failed. Row 212 lands alone (mos-1162); row
197 waits for an r6 after its lane proof stopped. No 212 path changed between c771a36f4 and this commit's
parent.
`queue review verify-commit 212` -> ok row 212 round 3: a2c72ac95 matches the commit candidate (21 paths).