M13 (stack-release.test.mjs) now runs for real, not just --plan, for an
activate to a pre-198 copy and for a rollback. Each checks the plan drop line,
then the run: exit 0, the drop line in the output (rollback: steps.log), and
no --board in the unit or the pointer.
M16 (serve.test.mjs) pins reply()'s event order ["scan","scan","send","bump",
"scan"] and requires the next index() to start a fresh scan. Mutant: the
counter bump at board.mjs:61.
M14 (board-inprocess.test.mjs) is a real createBoard over a tmux shim that
sleeps 1 s. The test measures the timer gap and /healthz elapsed time while
/api/board is pending. The spawnSync mutant in scan.mjs stalls the loop.
BUILD.md: M13 and M14 rows updated, M16 added, the M14 gap closed, N2 left open
with the reason.
UNVERIFIED: no node or tests run (Sage's gate; the test runs wait for CLEAR).